Is a Data Center Coming

Manassas County, VA

CloudHQ Manassas MDC Campus

CloudHQ. Under construction. 300 MW.

CloudHQ is building a three-building data center campus just south of the Route 28 and Route 234 interchange in Manassas, with two on-site substations planned to supply up to 300 megawatts of critical IT load.

Status
Under construction
Operator
CloudHQ
Applicant on record
CloudHQ
Location
near Route 28 and Route 234, Manassas, Manassas County, VA (approximate, city center)
Size
300 MW
Cooling
Not reported
Utility
Dominion Energy
Last updated
August 19, 2026

Sources

What it would mean nearby

The cooling design has not been reported. If it uses evaporative cooling, a 300 MW facility would draw roughly 951,000 to 3.4 million gallons of water a day, about what 10,900 households use.

Deferred fuel cost recovery (docket PUR-2026-00078) is pending; Dominion Energy says it would add about $7 to $9 to a typical monthly bill. Data center cost allocation and transmission rider (docket PUR-2026-00056) adds about $0.94 a month to a typical bill, decided August 1, 2026. 2025 biennial review base rate increase (docket PUR-2025-00058) adds about $11.24 a month to a typical bill from January 2026.

For a noise estimate and the three distance rings, check your own address.

Other tracked projects within 25 miles

Amazon IAD102 Amazon Web Services
1.9 mi SWOperatingPrince William County, VA
QTS Manassas DC5 Quality Technology Services
2.3 mi WOperatingPrince William County, VA
CloudHQ MCC1 CloudHQ
2.7 mi SWOperatingPrince William County, VA
COPT Data Center Operator not disclosed
3.1 mi WOperatingPrince William County, VA

Is it near you?

Corrections and tips: use the address in the footer. We link every claim to its source.