Manassas County, VA
CloudHQ Manassas MDC Campus
CloudHQ. Under construction. 300 MW.
CloudHQ is building a three-building data center campus just south of the Route 28 and Route 234 interchange in Manassas, with two on-site substations planned to supply up to 300 megawatts of critical IT load.
- Status
- Under construction
- Operator
- CloudHQ
- Applicant on record
- CloudHQ
- Location
- near Route 28 and Route 234, Manassas, Manassas County, VA (approximate, city center)
- Size
- 300 MW
- Cooling
- Not reported
- Utility
- Dominion Energy
- Last updated
- August 19, 2026
Sources
What it would mean nearby
The cooling design has not been reported. If it uses evaporative cooling, a 300 MW facility would draw roughly 951,000 to 3.4 million gallons of water a day, about what 10,900 households use.
Deferred fuel cost recovery (docket PUR-2026-00078) is pending; Dominion Energy says it would add about $7 to $9 to a typical monthly bill. Data center cost allocation and transmission rider (docket PUR-2026-00056) adds about $0.94 a month to a typical bill, decided August 1, 2026. 2025 biennial review base rate increase (docket PUR-2025-00058) adds about $11.24 a month to a typical bill from January 2026.
For a noise estimate and the three distance rings, check your own address.