| Amazon Data Services Sparks Campus |
Amazon |
Storey |
NV |
Under construction |
|
|
Sep 28, 2026 |
| Fleet Data Centers South Valley and Peru Ridge Campuses |
Fleet Data Centers |
Storey |
NV |
Under construction |
230 |
|
Sep 28, 2026 |
| "Project Mica" Google Data Center (Clay County) |
Google |
Clay |
MO |
Under construction |
700 |
|
Sep 24, 2026 |
| Beale Infrastructure De Soto Data Center Campus |
Beale Infrastructure |
Johnson |
KS |
Under construction |
|
|
Sep 24, 2026 |
| CloudBurst Oklahoma City Campus |
CloudBurst Data Centers |
Oklahoma |
OK |
Under construction |
200 |
|
Sep 24, 2026 |
| Core Scientific Muskogee Campus Expansion (Polaris) |
Core Scientific |
Muskogee |
OK |
Under construction |
440 |
|
Sep 24, 2026 |
| CoreWeave Kenilworth (NEST) Data Center |
CoreWeave |
Union |
NJ |
Under construction |
250 |
|
Sep 24, 2026 |
| Crane PDX01/PDX02 Data Center Campus |
Crane Data Centers |
Washington |
OR |
Under construction |
100 |
|
Sep 24, 2026 |
| Flexential Parker Data Center |
Flexential |
Douglas |
CO |
Under construction |
23 |
|
Sep 24, 2026 |
| Fortitude Mining Data Center (Grand Island) |
Fortitude Mining |
Hall |
NE |
Under construction |
|
|
Sep 24, 2026 |
| Google Lincoln North Data Center |
Google |
Lancaster |
NE |
Under construction |
|
|
Sep 24, 2026 |
| Google West Memphis Data Center Campus |
Google |
Crittenden |
AR |
Under construction |
600 |
|
Sep 24, 2026 |
| Grant Node AI/HPC Data Center (Keel Infrastructure, former Bitfarms mine) |
Keel Infrastructure |
Grant |
WA |
Under construction |
18 |
|
Sep 24, 2026 |
| HostDime SuperNova Data Center |
HostDime |
Orange |
FL |
Under construction |
|
|
Sep 24, 2026 |
| JPMorganChase Orangeburg Data Center Expansion |
JPMorganChase |
Rockland |
NY |
Under construction |
|
|
Sep 24, 2026 |
| Microsoft Malaga Data Center Campus |
Microsoft |
Chelan |
WA |
Under construction |
298 |
|
Sep 24, 2026 |
| Monarch Compute Campus (Nscale) |
Nscale |
Mason |
WV |
Under construction |
1350 |
|
Sep 24, 2026 |
| Nebius / DataOne Vineland Data Center |
Nebius Group |
Cumberland |
NJ |
Under construction |
300 |
|
Sep 24, 2026 |
| Nebius Independence Campus |
Nebius |
Jackson |
MO |
Under construction |
800 |
|
Sep 24, 2026 |
| NOVVA Data Centers Bayview Campus |
NOVVA Data Centers |
San Francisco |
CA |
Under construction |
36 |
|
Sep 24, 2026 |
| Olathe Data Center (Oppidan / T5 Data Centers) |
T5 Data Centers |
Johnson |
KS |
Under construction |
10 |
|
Sep 24, 2026 |
| Percheron Data Center (Rowan Digital Infrastructure) |
Rowan Digital Infrastructure |
Morrow |
OR |
Under construction |
300 |
|
Sep 24, 2026 |
| Prime Data Centers SMF02 |
Prime Data Centers |
Sacramento |
CA |
Under construction |
|
|
Sep 24, 2026 |
| Princeton Nurseries Data Center (WRV Nurseries South Brunswick) |
WRV Nurseries South Brunswick LLC |
Middlesex |
NJ |
Under construction |
|
|
Sep 24, 2026 |
| Project Anthem (Meta) |
Meta |
Tulsa |
OK |
Under construction |
|
|
Sep 24, 2026 |
| Project Clydesdale (Google / Beale Infrastructure) |
Beale Infrastructure |
Tulsa |
OK |
Under construction |
|
|
Sep 24, 2026 |
| Project Jupiter (Stargate / STACK Infrastructure / Oracle) |
Oracle Cloud Infrastructure |
Dona Ana |
NM |
Under construction |
|
|
Sep 24, 2026 |
| Quantum Frederick Data Center Campus (Quantum Loophole / Catellus / TPG) |
Catellus Development Corporation |
Frederick |
MD |
Under construction |
|
|
Sep 24, 2026 |
| Sabey SDC Umatilla Campus |
Sabey Data Centers |
Umatilla |
OR |
Under construction |
150 |
|
Sep 24, 2026 |
| TeraWulf Lake Mariner Data Center Expansion |
TeraWulf |
Niagara |
NY |
Under construction |
360 |
|
Sep 24, 2026 |
| Meta Johnstown Data Center |
Meta |
Licking |
OH |
Under construction |
|
|
Sep 21, 2026 |
| T5 @ Chicago IV Data Center Campus |
T5 Data Centers |
Lake |
IL |
Under construction |
1550 |
Hearing Oct 30 |
Sep 7, 2026 |
| Meta Stanton Springs Data Center (Newton County) |
Meta |
Newton |
GA |
Under construction |
|
|
Sep 2, 2026 |
| xAI Southaven Power Plant (MZX Tech) |
xAI |
DeSoto |
MS |
Under construction |
|
|
Sep 2, 2026 |
| Amazon Keystone Trade Center Data Center |
Amazon Web Services |
Bucks |
PA |
Under construction |
|
|
Aug 29, 2026 |
| Compass Datacenters Hoffman Estates Campus |
Compass Datacenters |
Cook |
IL |
Under construction |
|
|
Aug 29, 2026 |
| Edged Ankeny Data Center |
Edged |
Polk |
IA |
Under construction |
13 |
|
Aug 29, 2026 |
| Google Cedar Rapids Data Center (Big Cedar) |
Google |
Linn |
IA |
Under construction |
|
|
Aug 29, 2026 |
| Meta Beaver Dam Data Center |
Meta |
Dodge |
WI |
Under construction |
220 |
|
Aug 29, 2026 |
| Prime Data Centers Elk Grove Village Campus |
Prime Data Centers |
Cook |
IL |
Under construction |
275 |
|
Aug 29, 2026 |
| QTS Cedar Rapids Data Center Campus |
QTS Data Centers |
Linn |
IA |
Under construction |
|
|
Aug 29, 2026 |
| Stargate "The Barn" (OpenAI / Oracle / Related Digital) |
Related Digital |
Washtenaw |
MI |
Under construction |
1400 |
|
Aug 29, 2026 |
| Stream DC Chicago III (ORDC) |
Stream Data Centers |
Cook |
IL |
Under construction |
260 |
|
Aug 29, 2026 |
| TECfusions Upper Burrell Data Center |
TECfusions |
Westmoreland |
PA |
Under construction |
|
|
Aug 29, 2026 |
| Vantage Data Centers Lighthouse Campus (Port Washington) |
Vantage Data Centers |
Ozaukee |
WI |
Under construction |
|
|
Aug 29, 2026 |
| Advanced Energy and Intelligence Campus |
Fermi America |
Potter |
TX |
Under construction |
11000 |
|
Aug 19, 2026 |
| Aligned Energy Data Center PHX04 |
Aligned Data Centers |
Maricopa |
AZ |
Under construction |
|
|
Aug 19, 2026 |
| Aligned PHX-13 (Glendale campus) |
Aligned Data Centers |
Maricopa |
AZ |
Under construction |
72 |
|
Aug 19, 2026 |
| AWS New Carlisle Data Center Campus |
Amazon Web Services |
St. Joseph |
IN |
Under construction |
|
|
Aug 19, 2026 |
| Blueprint Georgetown Data Center |
Blueprint Data Centers |
Williamson |
TX |
Under construction |
25 |
|
Aug 19, 2026 |
| Centra Reno Data Center (RNO2 / Keystone) |
Centra |
Washoe |
NV |
Under construction |
12 |
|
Aug 19, 2026 |
| CloudBurst San Marcos Data Center I |
CloudBurst Data Centers / Evolve Holdings |
Hays |
TX |
Under construction |
1200 |
|
Aug 19, 2026 |
| CyrusOne DFW10 Data Center |
CyrusOne |
Bosque |
TX |
Under construction |
190 |
|
Aug 19, 2026 |
| CyrusOne New Albany Campus |
CyrusOne |
Licking |
OH |
Under construction |
|
|
Aug 19, 2026 |
| EdgeConneX Cedar Creek Data Center I |
EdgeConneX |
Bastrop |
TX |
Under construction |
|
|
Aug 19, 2026 |
| Lincoln Property Chandler Data Center (2500 W Frye Rd) |
Lincoln Property Company |
Maricopa |
AZ |
Under construction |
4 |
|
Aug 19, 2026 |
| Meta LEAP District Data Center Campus |
Meta |
Boone |
IN |
Under construction |
|
|
Aug 19, 2026 |
| Meta Wood County Data Center |
Meta |
Wood |
OH |
Under construction |
|
|
Aug 19, 2026 |
| Meta-BlackRock El Paso Data Center Campus |
Meta Platforms |
El Paso |
TX |
Under construction |
1000 |
|
Aug 19, 2026 |
| Microsoft FM 471 North Data Center |
Microsoft |
Medina |
TX |
Under construction |
|
|
Aug 19, 2026 |
| New Era Helium-Sharon AI Ector County Data Center |
New Era Helium / Sharon AI (joint venture) |
Ector |
TX |
Under construction |
250 |
|
Aug 19, 2026 |
| Prime Data Centers Caldwell County Campus (AUS01/AUS02) |
Prime Data Centers |
Caldwell |
TX |
Under construction |
|
|
Aug 19, 2026 |
| Project Blue |
Beale Infrastructure |
Pima |
AZ |
Under construction |
600 |
|
Aug 19, 2026 |
| Project Caprock Data Center Campus |
Aligned Data Centers |
Hale |
TX |
Under construction |
540 |
|
Aug 19, 2026 |
| Prometheus |
Meta |
Licking |
OH |
Under construction |
|
|
Aug 19, 2026 |
| Serverfarm CTX2 Data Center |
Serverfarm |
Harris |
TX |
Under construction |
|
|
Aug 19, 2026 |
| Serverfarm HTX2 Data Center |
Serverfarm |
Waller |
TX |
Under construction |
|
|
Aug 19, 2026 |
| Stargate Abilene Data Center Campus |
Crusoe Energy (site developer); OpenAI and Oracle (anchor tenants) |
Taylor |
TX |
Under construction |
1200 |
|
Aug 19, 2026 |
| Stargate Milam County Data Center (Freebird) |
SB Energy (SoftBank) |
Milam |
TX |
Under construction |
1000 |
|
Aug 19, 2026 |
| Tract Buckeye Technology Park (Project Range) |
Tract |
Maricopa |
AZ |
Under construction |
1800 |
|
Aug 19, 2026 |
| Vantage AZ1 Goodyear Campus |
Vantage Data Centers |
Maricopa |
AZ |
Under construction |
160 |
|
Aug 19, 2026 |
| Vantage Frontier Campus |
Vantage Data Centers |
Shackelford |
TX |
Under construction |
1400 |
|
Aug 19, 2026 |
| Vantage NV1 Campus (Storey County) |
Vantage Data Centers |
Storey |
NV |
Under construction |
224 |
|
Aug 19, 2026 |
| xAI Colossus 2 |
xAI |
Shelby |
TN |
Under construction |
|
|
Aug 19, 2026 |
| AWS Bossier Parish Campus |
Amazon Web Services |
Bossier |
LA |
Under construction |
|
|
Aug 18, 2026 |
| AWS Madison County Mega Site |
Amazon Web Services |
Madison |
MS |
Under construction |
|
|
Aug 18, 2026 |
| AWS Ridgeland Campus (Costas Property) |
Amazon Web Services |
Madison |
MS |
Under construction |
|
|
Aug 18, 2026 |
| NorthMark Cloud and Compute Spartanburg |
NorthMark Cloud and Compute |
Spartanburg |
SC |
Under construction |
450 |
|
Aug 17, 2026 |
| VoltCore Somerville Data Center |
VoltCore |
Morgan |
AL |
Under construction |
50 |
|
Aug 15, 2026 |
| Google Moncks Corner expansion |
Google |
Berkeley |
SC |
Under construction |
|
|
Aug 13, 2026 |
| Compass Datacenters Statesville Campus |
Compass Datacenters |
Iredell |
NC |
Under construction |
|
|
Aug 11, 2026 |
| Microsoft Douglasville Data Center (FTY101) |
Microsoft |
Douglas |
GA |
Under construction |
|
|
Aug 10, 2026 |
| Microsoft Palmetto Data Center |
Microsoft |
Fulton |
GA |
Under construction |
|
|
Aug 10, 2026 |
| Switch KEEP 2.0 Atlanta North Campus |
Switch |
Bartow |
GA |
Under construction |
|
|
Aug 1, 2026 |
| AWS Richmond County Campus |
Amazon Web Services |
Richmond |
NC |
Under construction |
|
|
Jul 31, 2026 |
| QTS Lake Wylie Campus |
QTS |
York |
SC |
Under construction |
|
|
Jul 21, 2026 |
| Meta Richland Parish Data Center (Hyperion) |
Meta |
Richland |
LA |
Under construction |
5000 |
|
Jul 13, 2026 |
| Hut 8 River Bend Data Center |
Hut 8 Corp |
West Feliciana |
LA |
Under construction |
300 |
|
Jul 1, 2026 |
| Meta Aiken County Data Center |
Meta |
Aiken |
SC |
Under construction |
200 |
|
Jul 1, 2026 |
| Google Botetourt Campus (Greenfield) |
Google |
Botetourt |
VA |
Under construction |
|
|
Jun 24, 2026 |
| Microsoft Mount Pleasant Phase 2 (MKE16/MKE17) |
Microsoft |
Racine |
WI |
Under construction |
|
|
Jun 24, 2026 |
| Core Scientific Dalton 4 |
Core Scientific |
Whitfield |
GA |
Under construction |
170 |
|
Jun 4, 2026 |
| Project Eisenhower |
QTS Data Centers |
Richmond |
GA |
Under construction |
|
|
Jun 2, 2026 |
| Google St. George Data Centers |
Google |
Dorchester |
SC |
Under construction |
|
|
May 29, 2026 |
| DC BLOX Atlanta East Hyperscale Data Center Campus |
DC BLOX |
Rockdale |
GA |
Under construction |
154 |
|
Apr 28, 2026 |
| Compass Datacenters Meridian Campus |
Compass Datacenters |
Lauderdale |
MS |
Under construction |
500 |
|
Apr 22, 2026 |
| Core Scientific Dalton 2 |
Core Scientific |
Whitfield |
GA |
Under construction |
145 |
|
Mar 2, 2026 |
| QTS Fayetteville Data Center Campus (Project Excalibur) |
QTS Data Centers |
Fayette |
GA |
Under construction |
|
|
Mar 1, 2026 |
| Aurora AI Factory |
Nvidia |
Manassas |
VA |
Under construction |
96 |
|
Oct 29, 2025 |
| Meta Stanton Springs Data Center (Walton County) |
Meta |
Walton |
GA |
Under construction |
|
|
Dec 1, 2021 |
| CleanArc Caroline County Campus |
CleanArc Data Centers |
Caroline |
VA |
Under construction |
900 |
|
|
| CloudHQ Manassas MDC Campus |
CloudHQ |
Manassas |
VA |
Under construction |
300 |
|
|
| Google Bermuda Hundred Campus |
Google |
Chesterfield |
VA |
Under construction |
|
|
|
| PowerHouse 95 (PH 95 North) |
PowerHouse Data Centers |
Spotsylvania |
VA |
Under construction |
800 |
|
|
| Project Camellia (OpenAI Data Center) |
OpenAI |
Effingham |
GA |
Approved |
3200 |
|
Sep 28, 2026 |
| "Project Green" AWS Data Center (Montgomery County) |
Amazon Web Services |
Montgomery |
MO |
Approved |
|
|
Sep 24, 2026 |
| "Project Horizon" Data Center (Starwood Digital Ventures / MARA, Kearney) |
Starwood Digital Ventures |
Buffalo |
NE |
Approved |
|
|
Sep 24, 2026 |
| "Project Shale" Google Data Center (Clay County) |
Google |
Clay |
MO |
Approved |
|
|
Sep 24, 2026 |
| "Project Spade" Google Data Center (Montgomery County) |
Google |
Montgomery |
MO |
Approved |
|
|
Sep 24, 2026 |
| Adams Fork Energy Campus (Twisted Gun Golf Course, Wharncliffe) |
TransGas Development Systems |
Mingo |
WV |
Approved |
|
|
Sep 24, 2026 |
| Adams Fork Harless Data Center Energy Campus |
TransGas Development Systems |
Mingo |
WV |
Approved |
2400 |
|
Sep 24, 2026 |
| Atlas Agro Data Center Campus (Horn Rapids) |
Atlas Agro North America |
Benton |
WA |
Approved |
|
|
Sep 24, 2026 |
| Avaio Digital Leo |
AVAIO Digital Partners |
Pulaski |
AR |
Approved |
150 |
|
Sep 24, 2026 |
| Camp Ground Road Data Center (Poe Companies / PowerHouse Data Centers) |
Poe Companies / PowerHouse Data Centers |
Jefferson |
KY |
Approved |
|
|
Sep 24, 2026 |
| Cannon Falls Technology Park (Tract) |
Tract |
Goodhue |
MN |
Approved |
|
|
Sep 24, 2026 |
| Crusoe Warrenton Data Center Campus |
Crusoe |
Warren |
MO |
Approved |
600 |
|
Sep 24, 2026 |
| Farmington Technology Park (Tract) |
Tract |
Dakota |
MN |
Approved |
708 |
|
Sep 24, 2026 |
| Festus Data Center (CRG) |
CRG (Clayco) |
Jefferson |
MO |
Approved |
|
|
Sep 24, 2026 |
| Fort Meade Data Center Campus (Stonebridge) |
Stonebridge |
Polk |
FL |
Approved |
|
|
Sep 24, 2026 |
| Franklin-Simpson Data Storage and Service Center (TenKey LandCo) |
TenKey LandCo I LLC |
Simpson |
KY |
Approved |
|
|
Sep 24, 2026 |
| Gemstone Technology Park |
Diode Ventures |
Ada |
ID |
Approved |
600 |
|
Sep 24, 2026 |
| Global AI Windsor Data Center |
Global AI |
Weld |
CO |
Approved |
28 |
|
Sep 24, 2026 |
| Google Stillwater Data Center Campus |
Google |
Payne |
OK |
Approved |
|
|
Sep 24, 2026 |
| Mason County Data Center (unnamed Fortune 100 developer) |
Operator not disclosed |
Mason |
KY |
Approved |
2200 |
|
Sep 24, 2026 |
| Meta Los Lunas Campus Expansion |
Meta |
Valencia |
NM |
Approved |
|
|
Sep 24, 2026 |
| Microsoft San Jose Data Center (SJDC) |
Microsoft Corporation |
Santa Clara |
CA |
Approved |
99 |
|
Sep 24, 2026 |
| ON3 Data Center |
Prism Capital Partners |
Essex |
NJ |
Approved |
|
|
Sep 24, 2026 |
| Penzance Bedington Intelligence Center |
Penzance |
Berkeley |
WV |
Approved |
600 |
|
Sep 24, 2026 |
| Project Mustang (Beale Infrastructure) |
Beale Infrastructure |
Rogers |
OK |
Approved |
|
|
Sep 24, 2026 |
| Project Spring (Google / White Rose Partners) |
Google |
Tulsa |
OK |
Approved |
|
|
Sep 24, 2026 |
| Project Taurus (Raeden) |
Raeden |
El Paso |
CO |
Approved |
50 |
Hearing Apr 13 |
Sep 24, 2026 |
| QTS Kearneysville (Berkeley/Jefferson County Data Center Campus) |
QTS Data Centers |
Berkeley |
WV |
Approved |
202 |
|
Sep 24, 2026 |
| STACK SVY03A Data Center Campus |
STACK Infrastructure |
Alameda |
CA |
Approved |
|
|
Sep 24, 2026 |
| T5 Data Centers Nampa (Park 84 conversion) |
T5 Data Centers |
Canyon |
ID |
Approved |
8 |
|
Sep 24, 2026 |
| Microsoft Licking County Data Center Campus |
Microsoft |
Licking |
OH |
Approved |
|
|
Sep 21, 2026 |
| Faircrest Street Data Center (Perry Township) |
Panattoni Development Co. |
Stark |
OH |
Approved |
240 |
|
Sep 14, 2026 |
| Project Camellia |
OpenAI |
Effingham |
GA |
Approved |
3200 |
|
Sep 14, 2026 |
| PORTS-Pike Technology Campus |
SB Energy |
Pike |
OH |
Approved |
800 |
|
Sep 2, 2026 |
| Project Baccara |
Operator not disclosed |
Maricopa |
AZ |
Approved |
700 |
|
Sep 2, 2026 |
| Pumpkin Technology Campus |
Google |
Columbia |
GA |
Approved |
|
|
Sep 2, 2026 |
| Salem 2 Data Center Campus (QTS) |
QTS Data Centers |
Luzerne |
PA |
Approved |
|
|
Sep 2, 2026 |
| White Oak Technology Park |
Google |
Columbia |
GA |
Approved |
|
|
Sep 2, 2026 |
| "Project Cannoli" Google Data Center (Van Buren Township) |
Google |
Wayne |
MI |
Approved |
1000 |
|
Aug 29, 2026 |
| Aligned Shippingport Data Center Campus (Project Phoenix) |
Aligned Data Centers |
Beaver |
PA |
Approved |
|
|
Aug 29, 2026 |
| Cedar Rapids Southwest Data Center (33rd Avenue SW) |
Oppidan Connect |
Linn |
IA |
Approved |
|
|
Aug 29, 2026 |
| CyrusOne Sangamon County Data Center |
CyrusOne |
Sangamon |
IL |
Approved |
636 |
|
Aug 29, 2026 |
| Dynamo DC Springdale Data Center |
Dynamo DC |
Allegheny |
PA |
Approved |
|
|
Aug 29, 2026 |
| Edged DeKalb Campus (Project Vector) |
Edged |
DeKalb |
IL |
Approved |
|
|
Aug 29, 2026 |
| Homer City Energy Campus |
Homer City Redevelopment LLC |
Indiana |
PA |
Approved |
4500 |
|
Aug 29, 2026 |
| Joliet Technology Center |
PowerHouse Data Centers |
Will |
IL |
Approved |
1800 |
|
Aug 29, 2026 |
| Meta Davenport Data Center (Vemerald) |
Meta |
Scott |
IA |
Approved |
|
|
Aug 29, 2026 |
| Metrobloks Southfield Data Center |
Metrobloks |
Oakland |
MI |
Approved |
100 |
|
Aug 29, 2026 |
| Microsoft Data Center Campus (Project Ruthenium) |
Microsoft |
Madison |
IA |
Approved |
|
|
Aug 29, 2026 |
| Oakland University AI Data Center (Fairmount Properties) |
Oakland University |
Oakland |
MI |
Approved |
20 |
|
Aug 29, 2026 |
| Project Cardinal Data Center Campus |
Pioneer Development |
Kendall |
IL |
Approved |
1800 |
|
Aug 29, 2026 |
| Project Steel Data Center Campus |
Prologis L.P. |
Kendall |
IL |
Approved |
|
|
Aug 29, 2026 |
| Tract Morris Technology Park |
Tract |
Grundy |
IL |
Approved |
1000 |
|
Aug 29, 2026 |
| Amazon Cosgray Road Data Center Fuel Cell Array |
Amazon |
Franklin |
OH |
Approved |
73 |
|
Aug 19, 2026 |
| Amazon Weaver Road Data Center |
Amazon |
Union |
OH |
Approved |
|
|
Aug 19, 2026 |
| AWS Project Cosmo (Marysville Innovation Park) |
Amazon Web Services |
Union |
OH |
Approved |
|
|
Aug 19, 2026 |
| AWS Project Rise (Wheatfield) |
Amazon Web Services |
Jasper |
IN |
Approved |
|
|
Aug 19, 2026 |
| Black Mountain Fort Worth Data Center |
Black Mountain Power LLC |
Tarrant |
TX |
Approved |
|
|
Aug 19, 2026 |
| CyrusOne Mesa Campus (Elliot and Ellsworth) |
CyrusOne |
Maricopa |
AZ |
Approved |
|
|
Aug 19, 2026 |
| Edged Veale Ranch Data Center |
Edged Data Centers (Endeavour) |
Tarrant |
TX |
Approved |
|
|
Aug 19, 2026 |
| Energy Generation and Technology Campus |
W Holdings |
Pinal |
AZ |
Approved |
|
|
Aug 19, 2026 |
| Monarch Data Center Campus |
Copia Power |
Lyon |
NV |
Approved |
1000 |
|
Aug 19, 2026 |
| Project Marvel (QTS Bessemer) |
QTS Data Centers |
Jefferson |
AL |
Approved |
1200 |
|
Aug 19, 2026 |
| Project Midway |
LPI Group |
Pinal |
AZ |
Approved |
|
|
Aug 19, 2026 |
| QumulusAI Denton Modular Data Center |
QumulusAI |
Denton |
TX |
Approved |
20 |
|
Aug 19, 2026 |
| Radius Data Centers AllPoints 18 and 19 |
Radius Data Centers |
Hendricks |
IN |
Approved |
|
|
Aug 19, 2026 |
| Switch LAS19 (southwest Las Vegas expansion) |
Switch |
Clark |
NV |
Approved |
|
|
Aug 19, 2026 |
| Tonopah Data Center Campus (491st Ave and Thomas Rd) |
Operator not disclosed |
Maricopa |
AZ |
Approved |
|
|
Aug 19, 2026 |
| AWS Caddo Parish Campus (Resilient Technology Park) |
Amazon Web Services |
Caddo |
LA |
Approved |
|
|
Aug 18, 2026 |
| Burkhalter Road Data Center |
4AM Development LLC |
Bulloch |
GA |
Approved |
99 |
|
Aug 18, 2026 |
| Prime Storage Delk Road Data Center |
Prime Storage |
Cobb |
GA |
Approved |
18 |
|
Aug 13, 2026 |
| 300 West Adams Street Data Center Conversion |
Operator not disclosed |
Cook |
IL |
Approved |
|
|
Aug 12, 2026 |
| Dahlgren West |
Operator not disclosed |
King George |
VA |
Approved |
|
|
Aug 1, 2026 |
| Coleman Road Data Center |
DC BLOX |
Lowndes |
GA |
Approved |
|
|
Jul 28, 2026 |
| Red Ace Data Center Campus |
Red Ace Capital Management |
Culpeper |
VA |
Approved |
|
|
Jul 2, 2026 |
| Applied Digital Boyce Campus |
Applied Digital |
Rapides |
LA |
Approved |
|
|
Jul 1, 2026 |
| Cielo Digital Infrastructure Gaffney project |
Cielo Digital Infrastructure |
Cherokee |
SC |
Approved |
300 |
|
Jul 1, 2026 |
| Stack Infrastructure Berry Hill Megasite |
Stack Infrastructure |
Pittsylvania |
VA |
Approved |
|
|
Jun 30, 2026 |
| Project Firecracker |
Microsoft |
Floyd |
GA |
Approved |
|
|
Jun 1, 2026 |
| Project Sail |
Prologis |
Coweta |
GA |
Approved |
900 |
|
May 11, 2026 |
| Ashland Technology Park (Tract) |
Tract |
Hanover |
VA |
Approved |
|
|
Apr 1, 2026 |
| Green Energy Ventures Data Center Campus |
Green Energy Ventures |
King George |
VA |
Approved |
|
|
Feb 19, 2026 |
| Forsyth Technology Campus |
Trammell Crow Company |
Monroe |
GA |
Approved |
|
|
Feb 3, 2026 |
| Pine Ridge Technology Park |
Eagle Rock Partners LLC |
Twiggs |
GA |
Approved |
900 |
|
Feb 1, 2026 |
| Wallace Jackson Data Center Campus |
Wallace Jackson LLC |
Spalding |
GA |
Approved |
|
|
Jan 22, 2026 |
| Microsoft Mount Pleasant Area II Expansion |
Microsoft |
Racine |
WI |
Approved |
|
|
Jan 21, 2026 |
| Northern Data Maysville |
Northern Data Group |
Jackson |
GA |
Approved |
200 |
|
Jan 1, 2026 |
| Rumble Technology Park |
Cloverleaf Infrastructure |
Monroe |
GA |
Approved |
1120 |
|
Jan 1, 2026 |
| Bells Ferry Road Data Center |
MMM Acquisitions LLC |
Cobb |
GA |
Approved |
108 |
|
Jun 17, 2025 |
| TA Realty Data Center (Tanners Church Road) |
TA Realty subsidiary |
Clayton |
GA |
Approved |
180 |
|
Jun 12, 2025 |
| Project Bunkhouse |
Digital Realty |
Bartow |
GA |
Approved |
1830 |
|
Jun 4, 2025 |
| Spring Place Data Center |
Operator not disclosed |
Bartow |
GA |
Approved |
|
|
Jun 4, 2025 |
| Coosa Data Center |
Atlas Development |
Floyd |
GA |
Approved |
|
|
May 28, 2025 |
| Project Peach |
North Coweta Investors |
Coweta |
GA |
Approved |
700 |
|
Apr 16, 2025 |
| Henderson Farms Data Center |
Southeast Property Holdings, LLC |
Henry |
GA |
Approved |
|
|
Mar 28, 2025 |
| Dixon Data Center |
Atlas Development |
Floyd |
GA |
Approved |
|
|
Feb 5, 2025 |