| Advanced Energy and Intelligence Campus |
Fermi America |
Potter |
TX |
Under construction |
11000 |
|
Aug 19, 2026 |
| Aligned Energy Data Center PHX04 |
Aligned Data Centers |
Maricopa |
AZ |
Under construction |
|
|
Aug 19, 2026 |
| Aligned PHX-13 (Glendale campus) |
Aligned Data Centers |
Maricopa |
AZ |
Under construction |
72 |
|
Aug 19, 2026 |
| AWS New Carlisle Data Center Campus |
Amazon Web Services |
St. Joseph |
IN |
Under construction |
|
|
Aug 19, 2026 |
| Blueprint Georgetown Data Center |
Blueprint Data Centers |
Williamson |
TX |
Under construction |
25 |
|
Aug 19, 2026 |
| Centra Reno Data Center (RNO2 / Keystone) |
Centra |
Washoe |
NV |
Under construction |
12 |
|
Aug 19, 2026 |
| CloudBurst San Marcos Data Center I |
CloudBurst Data Centers / Evolve Holdings |
Hays |
TX |
Under construction |
1200 |
|
Aug 19, 2026 |
| CyrusOne DFW10 Data Center |
CyrusOne |
Bosque |
TX |
Under construction |
190 |
|
Aug 19, 2026 |
| CyrusOne New Albany Campus |
CyrusOne |
Licking |
OH |
Under construction |
|
|
Aug 19, 2026 |
| EdgeConneX Cedar Creek Data Center I |
EdgeConneX |
Bastrop |
TX |
Under construction |
|
|
Aug 19, 2026 |
| Fleet Data Centers South Valley and Peru Ridge Campuses |
Fleet Data Centers |
Storey |
NV |
Under construction |
230 |
|
Aug 19, 2026 |
| Lincoln Property Chandler Data Center (2500 W Frye Rd) |
Lincoln Property Company |
Maricopa |
AZ |
Under construction |
4 |
|
Aug 19, 2026 |
| Meta Johnstown Data Center |
Meta |
Licking |
OH |
Under construction |
|
|
Aug 19, 2026 |
| Meta LEAP District Data Center Campus |
Meta |
Boone |
IN |
Under construction |
|
|
Aug 19, 2026 |
| Meta Wood County Data Center |
Meta |
Wood |
OH |
Under construction |
|
|
Aug 19, 2026 |
| Meta-BlackRock El Paso Data Center Campus |
Meta Platforms |
El Paso |
TX |
Under construction |
1000 |
|
Aug 19, 2026 |
| Microsoft FM 471 North Data Center |
Microsoft |
Medina |
TX |
Under construction |
|
|
Aug 19, 2026 |
| New Era Helium-Sharon AI Ector County Data Center |
New Era Helium / Sharon AI (joint venture) |
Ector |
TX |
Under construction |
250 |
|
Aug 19, 2026 |
| Prime Data Centers Caldwell County Campus (AUS01/AUS02) |
Prime Data Centers |
Caldwell |
TX |
Under construction |
|
|
Aug 19, 2026 |
| Project Blue |
Beale Infrastructure |
Pima |
AZ |
Under construction |
600 |
|
Aug 19, 2026 |
| Project Caprock Data Center Campus |
Aligned Data Centers |
Hale |
TX |
Under construction |
540 |
|
Aug 19, 2026 |
| Prometheus |
Meta |
Licking |
OH |
Under construction |
|
|
Aug 19, 2026 |
| Serverfarm CTX2 Data Center |
Serverfarm |
Harris |
TX |
Under construction |
|
|
Aug 19, 2026 |
| Serverfarm HTX2 Data Center |
Serverfarm |
Waller |
TX |
Under construction |
|
|
Aug 19, 2026 |
| Stargate Abilene Data Center Campus |
Crusoe Energy (site developer); OpenAI and Oracle (anchor tenants) |
Taylor |
TX |
Under construction |
1200 |
|
Aug 19, 2026 |
| Stargate Milam County Data Center (Freebird) |
SB Energy (SoftBank) |
Milam |
TX |
Under construction |
1000 |
|
Aug 19, 2026 |
| Tract Buckeye Technology Park (Project Range) |
Tract |
Maricopa |
AZ |
Under construction |
1800 |
|
Aug 19, 2026 |
| Vantage AZ1 Goodyear Campus |
Vantage Data Centers |
Maricopa |
AZ |
Under construction |
160 |
|
Aug 19, 2026 |
| Vantage Frontier Campus |
Vantage Data Centers |
Shackelford |
TX |
Under construction |
1400 |
|
Aug 19, 2026 |
| Vantage NV1 Campus (Storey County) |
Vantage Data Centers |
Storey |
NV |
Under construction |
224 |
|
Aug 19, 2026 |
| xAI Colossus 2 |
xAI |
Shelby |
TN |
Under construction |
|
|
Aug 19, 2026 |
| xAI Southaven Power Plant (MZX Tech) |
xAI |
DeSoto |
MS |
Under construction |
|
Hearing Aug 24 |
Aug 19, 2026 |
| AWS Bossier Parish Campus |
Amazon Web Services |
Bossier |
LA |
Under construction |
|
|
Aug 18, 2026 |
| AWS Madison County Mega Site |
Amazon Web Services |
Madison |
MS |
Under construction |
|
|
Aug 18, 2026 |
| AWS Ridgeland Campus (Costas Property) |
Amazon Web Services |
Madison |
MS |
Under construction |
|
|
Aug 18, 2026 |
| NorthMark Cloud and Compute Spartanburg |
NorthMark Cloud and Compute |
Spartanburg |
SC |
Under construction |
450 |
|
Aug 17, 2026 |
| VoltCore Somerville Data Center |
VoltCore |
Morgan |
AL |
Under construction |
50 |
|
Aug 15, 2026 |
| Google Moncks Corner expansion |
Google |
Berkeley |
SC |
Under construction |
|
|
Aug 13, 2026 |
| Compass Datacenters Statesville Campus |
Compass Datacenters |
Iredell |
NC |
Under construction |
|
|
Aug 11, 2026 |
| Microsoft Douglasville Data Center (FTY101) |
Microsoft |
Douglas |
GA |
Under construction |
|
|
Aug 10, 2026 |
| Microsoft Palmetto Data Center |
Microsoft |
Fulton |
GA |
Under construction |
|
|
Aug 10, 2026 |
| Switch KEEP 2.0 Atlanta North Campus |
Switch |
Bartow |
GA |
Under construction |
|
|
Aug 1, 2026 |
| AWS Richmond County Campus |
Amazon Web Services |
Richmond |
NC |
Under construction |
|
|
Jul 31, 2026 |
| QTS Lake Wylie Campus |
QTS |
York |
SC |
Under construction |
|
|
Jul 21, 2026 |
| Meta Richland Parish Data Center (Hyperion) |
Meta |
Richland |
LA |
Under construction |
5000 |
|
Jul 13, 2026 |
| Hut 8 River Bend Data Center |
Hut 8 Corp |
West Feliciana |
LA |
Under construction |
300 |
|
Jul 1, 2026 |
| Meta Aiken County Data Center |
Meta |
Aiken |
SC |
Under construction |
200 |
|
Jul 1, 2026 |
| Google Botetourt Campus (Greenfield) |
Google |
Botetourt |
VA |
Under construction |
|
|
Jun 24, 2026 |
| Core Scientific Dalton 4 |
Core Scientific |
Whitfield |
GA |
Under construction |
170 |
|
Jun 4, 2026 |
| Project Eisenhower |
QTS Data Centers |
Richmond |
GA |
Under construction |
|
|
Jun 2, 2026 |
| Google St. George Data Centers |
Google |
Dorchester |
SC |
Under construction |
|
|
May 29, 2026 |
| DC BLOX Atlanta East Hyperscale Data Center Campus |
DC BLOX |
Rockdale |
GA |
Under construction |
154 |
|
Apr 28, 2026 |
| Compass Datacenters Meridian Campus |
Compass Datacenters |
Lauderdale |
MS |
Under construction |
500 |
|
Apr 22, 2026 |
| Core Scientific Dalton 2 |
Core Scientific |
Whitfield |
GA |
Under construction |
145 |
|
Mar 2, 2026 |
| QTS Fayetteville Data Center Campus (Project Excalibur) |
QTS Data Centers |
Fayette |
GA |
Under construction |
|
|
Mar 1, 2026 |
| Aurora AI Factory |
Nvidia |
Manassas |
VA |
Under construction |
96 |
|
Oct 29, 2025 |
| Meta Stanton Springs Data Center (Walton County) |
Meta |
Walton |
GA |
Under construction |
|
|
Dec 1, 2021 |
| Meta Stanton Springs Data Center (Newton County) |
Meta |
Newton |
GA |
Under construction |
|
|
Feb 26, 2021 |
| CleanArc Caroline County Campus |
CleanArc Data Centers |
Caroline |
VA |
Under construction |
900 |
|
|
| CloudHQ Manassas MDC Campus |
CloudHQ |
Manassas |
VA |
Under construction |
300 |
|
|
| Google Bermuda Hundred Campus |
Google |
Chesterfield |
VA |
Under construction |
|
|
|
| PowerHouse 95 (PH 95 North) |
PowerHouse Data Centers |
Spotsylvania |
VA |
Under construction |
800 |
|
|
| Amazon Cosgray Road Data Center Fuel Cell Array |
Amazon |
Franklin |
OH |
Approved |
73 |
|
Aug 19, 2026 |
| Amazon Weaver Road Data Center |
Amazon |
Union |
OH |
Approved |
|
|
Aug 19, 2026 |
| AWS Project Cosmo (Marysville Innovation Park) |
Amazon Web Services |
Union |
OH |
Approved |
|
|
Aug 19, 2026 |
| AWS Project Rise (Wheatfield) |
Amazon Web Services |
Jasper |
IN |
Approved |
|
|
Aug 19, 2026 |
| Black Mountain Fort Worth Data Center |
Black Mountain Power LLC |
Tarrant |
TX |
Approved |
|
|
Aug 19, 2026 |
| CyrusOne Mesa Campus (Elliot and Ellsworth) |
CyrusOne |
Maricopa |
AZ |
Approved |
|
|
Aug 19, 2026 |
| Edged Veale Ranch Data Center |
Edged Data Centers (Endeavour) |
Tarrant |
TX |
Approved |
|
|
Aug 19, 2026 |
| Energy Generation and Technology Campus |
W Holdings |
Pinal |
AZ |
Approved |
|
|
Aug 19, 2026 |
| Faircrest Street Data Center (Perry Township) |
Panattoni Development Co. |
Stark |
OH |
Approved |
240 |
|
Aug 19, 2026 |
| Microsoft Licking County Data Center Campus |
Microsoft |
Licking |
OH |
Approved |
|
|
Aug 19, 2026 |
| Monarch Data Center Campus |
Copia Power |
Lyon |
NV |
Approved |
1000 |
|
Aug 19, 2026 |
| Project Baccara |
Operator not disclosed |
Maricopa |
AZ |
Approved |
700 |
|
Aug 19, 2026 |
| Project Marvel (QTS Bessemer) |
QTS Data Centers |
Jefferson |
AL |
Approved |
1200 |
|
Aug 19, 2026 |
| Project Midway |
LPI Group |
Pinal |
AZ |
Approved |
|
|
Aug 19, 2026 |
| QumulusAI Denton Modular Data Center |
QumulusAI |
Denton |
TX |
Approved |
20 |
|
Aug 19, 2026 |
| Radius Data Centers AllPoints 18 and 19 |
Radius Data Centers |
Hendricks |
IN |
Approved |
|
|
Aug 19, 2026 |
| Switch LAS19 (southwest Las Vegas expansion) |
Switch |
Clark |
NV |
Approved |
|
|
Aug 19, 2026 |
| Tonopah Data Center Campus (491st Ave and Thomas Rd) |
Operator not disclosed |
Maricopa |
AZ |
Approved |
|
|
Aug 19, 2026 |
| AWS Caddo Parish Campus (Resilient Technology Park) |
Amazon Web Services |
Caddo |
LA |
Approved |
|
|
Aug 18, 2026 |
| Burkhalter Road Data Center |
4AM Development LLC |
Bulloch |
GA |
Approved |
99 |
|
Aug 18, 2026 |
| Prime Storage Delk Road Data Center |
Prime Storage |
Cobb |
GA |
Approved |
18 |
|
Aug 13, 2026 |
| Dahlgren West |
Operator not disclosed |
King George |
VA |
Approved |
|
|
Aug 1, 2026 |
| Coleman Road Data Center |
DC BLOX |
Lowndes |
GA |
Approved |
|
|
Jul 28, 2026 |
| Project Camellia |
OpenAI |
Effingham |
GA |
Approved |
3200 |
|
Jul 23, 2026 |
| Red Ace Data Center Campus |
Red Ace Capital Management |
Culpeper |
VA |
Approved |
|
|
Jul 2, 2026 |
| Applied Digital Boyce Campus |
Applied Digital |
Rapides |
LA |
Approved |
|
|
Jul 1, 2026 |
| Cielo Digital Infrastructure Gaffney project |
Cielo Digital Infrastructure |
Cherokee |
SC |
Approved |
300 |
|
Jul 1, 2026 |
| Stack Infrastructure Berry Hill Megasite |
Stack Infrastructure |
Pittsylvania |
VA |
Approved |
|
|
Jun 30, 2026 |
| Project Firecracker |
Microsoft |
Floyd |
GA |
Approved |
|
|
Jun 1, 2026 |
| Project Sail |
Prologis |
Coweta |
GA |
Approved |
900 |
|
May 11, 2026 |
| Ashland Technology Park (Tract) |
Tract |
Hanover |
VA |
Approved |
|
|
Apr 1, 2026 |
| Green Energy Ventures Data Center Campus |
Green Energy Ventures |
King George |
VA |
Approved |
|
|
Feb 19, 2026 |
| Pumpkin Technology Campus |
Operator not disclosed |
Columbia |
GA |
Approved |
|
|
Feb 4, 2026 |
| White Oak Technology Park |
Google |
Columbia |
GA |
Approved |
|
|
Feb 4, 2026 |
| Forsyth Technology Campus |
Trammell Crow Company |
Monroe |
GA |
Approved |
|
|
Feb 3, 2026 |
| Pine Ridge Technology Park |
Eagle Rock Partners LLC |
Twiggs |
GA |
Approved |
900 |
|
Feb 1, 2026 |
| Wallace Jackson Data Center Campus |
Wallace Jackson LLC |
Spalding |
GA |
Approved |
|
|
Jan 22, 2026 |
| Northern Data Maysville |
Northern Data Group |
Jackson |
GA |
Approved |
200 |
|
Jan 1, 2026 |
| Rumble Technology Park |
Cloverleaf Infrastructure |
Monroe |
GA |
Approved |
1120 |
|
Jan 1, 2026 |
| Bells Ferry Road Data Center |
MMM Acquisitions LLC |
Cobb |
GA |
Approved |
108 |
|
Jun 17, 2025 |
| TA Realty Data Center (Tanners Church Road) |
TA Realty subsidiary |
Clayton |
GA |
Approved |
180 |
|
Jun 12, 2025 |
| Project Bunkhouse |
Digital Realty |
Bartow |
GA |
Approved |
1830 |
|
Jun 4, 2025 |
| Spring Place Data Center |
Operator not disclosed |
Bartow |
GA |
Approved |
|
|
Jun 4, 2025 |
| Coosa Data Center |
Atlas Development |
Floyd |
GA |
Approved |
|
|
May 28, 2025 |
| Project Peach |
North Coweta Investors |
Coweta |
GA |
Approved |
700 |
|
Apr 16, 2025 |
| Henderson Farms Data Center |
Southeast Property Holdings, LLC |
Henry |
GA |
Approved |
|
|
Mar 28, 2025 |
| Dixon Data Center |
Atlas Development |
Floyd |
GA |
Approved |
|
|
Feb 5, 2025 |
| TC Atlanta Development Data Center |
TC Atlanta Development |
Douglas |
GA |
Approved |
|
|
Feb 4, 2025 |
| Sailfish Investors Data Center Campus |
Sailfish Investors |
Walton |
GA |
Approved |
|
|
Jan 15, 2025 |
| Province Group Powhatan Campus |
Province Group |
Powhatan |
VA |
Approved |
300 |
|
Oct 28, 2024 |
| Microsoft Union City Data Center Campus (ATL11) |
Microsoft |
Fulton |
GA |
Approved |
|
|
Sep 26, 2024 |
| Hourigan Rezoning |
Hourigan |
Henrico |
VA |
Approved |
|
|
May 1, 2024 |
| Cielo Digital Infrastructure Campus |
Cielo Digital Infrastructure LLC (Arroyo Investors) |
Culpeper |
VA |
Approved |
240 |
|
Dec 5, 2023 |
| Anchorstone SOVA Route 58 East Campus |
Anchorstone Advisors LLC |
Pittsylvania |
VA |
Approved |
200 |
|
|
| Arcola Grove Rezoning |
Operator not disclosed |
Loudoun |
VA |
Approved |
|
|
|
| Cross Mill Center |
Operator not disclosed |
Loudoun |
VA |
Approved |
|
|
|
| Upper Magnolia Green (Google) |
Google |
Chesterfield |
VA |
Approved |
|
|
|
| Aligned Data Centers Pataskala Proposal |
Aligned Data Centers |
Licking |
OH |
Filed |
|
|
Aug 19, 2026 |
| Aligned Energy Data Center PHX06 |
Aligned Data Centers |
Maricopa |
AZ |
Filed |
|
|
Aug 19, 2026 |
| Bitdeer Shalersville Data Center Proposal |
Bitdeer Technologies Group |
Portage |
OH |
Filed |
750 |
|
Aug 19, 2026 |
| Cologix Johnstown Campus |
Cologix |
Licking |
OH |
Filed |
800 |
|
Aug 19, 2026 |
| Cologix Orange Township Campus |
Cologix |
Delaware |
OH |
Filed |
|
|
Aug 19, 2026 |
| Compass PHX II Campus |
Compass Datacenters |
Maricopa |
AZ |
Filed |
108 |
|
Aug 19, 2026 |
| Crusoe-Microsoft Abilene AI Factory Expansion |
Crusoe Energy |
Taylor |
TX |
Filed |
|
|
Aug 19, 2026 |
| EdgeConneX Ashville Data Center |
EdgeConneX |
Pickaway |
OH |
Filed |
800 |
|
Aug 19, 2026 |
| EdgeConneX Cedar Creek Data Center II |
EdgeConneX |
Bastrop |
TX |
Filed |
|
|
Aug 19, 2026 |
| Google Armstrong County Data Center |
Google |
Armstrong |
TX |
Filed |
|
|
Aug 19, 2026 |
| Google Haskell County Data Centers |
Google |
Haskell |
TX |
Filed |
|
|
Aug 19, 2026 |
| Google Midlothian Data Center Campus (Fifth Building) |
Google |
Ellis |
TX |
Filed |
|
|
Aug 19, 2026 |
| Hut 8 Beacon Point Data Center |
Hut 8 |
Nueces |
TX |
Filed |
|
|
Aug 19, 2026 |
| La Osa Project (Vermaland) |
Vermaland LLC |
Pinal |
AZ |
Filed |
1000 |
Hearing Aug 26 |
Aug 19, 2026 |
| Microsoft Granger Data Center |
Microsoft |
St. Joseph |
IN |
Filed |
|
|
Aug 19, 2026 |
| Microsoft Perry Township Data Center |
Microsoft |
Stark |
OH |
Filed |
|
|
Aug 19, 2026 |
| Microsoft PHX-83 (El Mirage campus expansion) |
Microsoft |
Maricopa |
AZ |
Filed |
|
|
Aug 19, 2026 |
| Microsoft San Antonio Data Center |
Microsoft |
Bexar |
TX |
Filed |
|
|
Aug 19, 2026 |
| Microsoft SAT 82 Data Center |
Microsoft |
Medina |
TX |
Filed |
|
|
Aug 19, 2026 |
| Midland County Gas-Powered Data Center Platform |
Operator not disclosed |
Midland |
TX |
Filed |
150 |
|
Aug 19, 2026 |
| Mt. Comfort Technology Park |
EQT Real Estate |
Hancock |
IN |
Filed |
|
|
Aug 19, 2026 |
| NTT Global Data Center Mesa (Pecos and Crismon) |
NTT Global Data Centers |
Maricopa |
AZ |
Filed |
|
|
Aug 19, 2026 |
| Project Hutto Data Center |
Zydeco |
Williamson |
TX |
Filed |
70 |
|
Aug 19, 2026 |
| Project Infrared (CORVA) Data Center |
CORVA Infrastructure Services |
Lubbock |
TX |
Filed |
27 |
|
Aug 19, 2026 |
| Sunbury Area Data Center Campus (Trenton Township) |
City of Sunbury |
Delaware |
OH |
Filed |
|
|
Aug 19, 2026 |
| Tract Caldwell Valley Technology Park |
Tract |
Caldwell |
TX |
Filed |
4000 |
|
Aug 19, 2026 |
| WhiteFiber Yadkin County campuses (NC-2, NC-3) |
WhiteFiber |
Yadkin |
NC |
Filed |
60 |
|
Aug 19, 2026 |
| 300 Jones Road data center |
Operator not disclosed |
Spartanburg |
SC |
Filed |
|
Hearing Sep 21 |
Aug 17, 2026 |
| Gardner Property Data Centers |
JK Land Holdings (Chuck Kuhn) |
Prince William |
VA |
Filed |
|
|
Aug 17, 2026 |
| Project Oak |
Operator not disclosed |
Coweta |
GA |
Filed |
|
Hearing Aug 25 |
Aug 13, 2026 |
| AWS Warren County Data Center |
Amazon Web Services |
Warren |
MS |
Filed |
|
|
Aug 1, 2026 |
| Crossroads Tech Campus |
Operator not disclosed |
Spotsylvania |
VA |
Filed |
|
|
Aug 1, 2026 |
| Beacon Data Centers Mobile County Campus |
Beacon Data Centers |
Mobile |
AL |
Filed |
|
|
Jul 30, 2026 |
| Haven Oak Tech Park |
Tract |
Dinwiddie |
VA |
Filed |
|
|
Jul 30, 2026 |
| Tuckahoe Technology Park |
Tract |
Goochland |
VA |
Filed |
900 |
|
Jul 27, 2026 |
| Brown Farm Road Data Center |
Oakley Real Estate Partners |
Bartow |
GA |
Filed |
|
Hearing Aug 24 |
Jul 22, 2026 |
| Dulles Technology Park |
Operator not disclosed |
Loudoun |
VA |
Filed |
|
|
Jul 1, 2026 |
| Project Indo |
Operator not disclosed |
Bartow |
GA |
Filed |
2000 |
|
Jul 1, 2026 |
| Spring Valley Tech Park |
Operator not disclosed |
Loudoun |
VA |
Filed |
|
|
Jul 1, 2026 |
| Forest Lane Data Center |
Operator not disclosed |
Stafford |
VA |
Filed |
|
|
Jun 15, 2026 |
| Google LaGrange Data Center |
Google |
Troup |
GA |
Filed |
|
|
Apr 21, 2026 |
| Virginia Technology Park |
Equus Capital Partners Ltd. |
Frederick |
VA |
Filed |
|
|
Apr 10, 2026 |
| Bridgeport Data Centers |
Operator not disclosed |
Coweta |
GA |
Filed |
|
|
Apr 1, 2026 |
| Hickman Property Data Center Campus |
East Village Dothan, LLC |
Carroll |
GA |
Filed |
|
|
Mar 1, 2026 |
| PCC-DeKalb Data Center Campus |
PCC-DeKalb, LLC |
DeKalb |
GA |
Filed |
|
|
Jan 1, 2026 |
| Project Avemore |
Atlas Development LLC |
Carroll |
GA |
Filed |
|
|
Jan 1, 2026 |
| Rockdale Technology Part 1 |
SDP Acquisitions |
Rockdale |
GA |
Filed |
|
|
Jan 1, 2026 |
| River Park (Highway 16) |
Operator not disclosed |
Butts |
GA |
Filed |
|
|
Dec 1, 2025 |
| Project West |
WHP-GA LLC |
Troup |
GA |
Filed |
600 |
|
Nov 26, 2025 |
| Newton County Technology Park (Social Circle Technology Park) |
TPA Group / SC Infrastructure LLC |
Newton |
GA |
Filed |
|
|
May 26, 2025 |
| Gregory Road Data Center Campus |
JBW Investments LLC / JF Land Investments LLC |
Newton |
GA |
Filed |
|
|
Mar 28, 2025 |
| Rocky Creek Road Data Center |
0 Rocky Creek Road, LLC |
Henry |
GA |
Filed |
|
|
Mar 28, 2025 |
| Strickland Road Farm Data Center |
Strickland Road Farms, LLC |
Henry |
GA |
Filed |
|
|
Mar 28, 2025 |
| Embry Development Villa Rica site |
Embry Development Company |
Carroll |
GA |
Filed |
|
|
Feb 13, 2025 |
| AWS Butts County - Building 1 |
Amazon (AWS) |
Butts |
GA |
Filed |
69 |
|
Jan 7, 2025 |
| Stonewall Tell Data Center (RSC) |
RSC Investment Management LLC |
Fulton |
GA |
Filed |
|
|
Dec 10, 2024 |
| Project Pegasus (Coweta County, T5) |
T5@Atlanta IV, LP |
Coweta |
GA |
Filed |
|
|
Feb 1, 2024 |
| EdgeCore Culpeper Campus |
EdgeCore Digital Infrastructure |
Culpeper |
VA |
Filed |
432 |
|
|
| EdgeCore Louisa County Campus |
EdgeCore Digital Infrastructure |
Louisa |
VA |
Filed |
1100 |
|
|
| Mattameade Tech Campus (formerly Orrock Tech Campus) |
Amazon Web Services |
Caroline |
VA |
Filed |
|
|
|
| Microsoft Boydton Expansion |
Microsoft |
Mecklenburg |
VA |
Filed |
|
|
|
| Winchester Gateway |
Operator not disclosed |
Frederick |
VA |
Filed |
|
|
|
| Cisco Systems Data Center |
Cisco Systems |
Collin |
TX |
Operating |
|
|
Aug 19, 2026 |
| Core Scientific Denton Data Center |
Core Scientific (hosting CoreWeave) |
Denton |
TX |
Operating |
|
|
Aug 19, 2026 |
| Duos Edge AI Amarillo Edge Data Center II |
Duos Edge AI |
Potter |
TX |
Operating |
|
|
Aug 19, 2026 |
| Edged New Albany Data Center |
Edged |
Licking |
OH |
Operating |
24 |
|
Aug 19, 2026 |
| Flexential Cincinnati (West Chester) Data Center |
Flexential |
Butler |
OH |
Operating |
4 |
|
Aug 19, 2026 |
| Google Fort Wayne Data Center |
Google |
Allen |
IN |
Operating |
|
|
Aug 19, 2026 |
| Google Storey County Data Center |
Google |
Storey |
NV |
Operating |
|
|
Aug 19, 2026 |
| Microsoft PHX-10 Goodyear Campus |
Microsoft |
Maricopa |
AZ |
Operating |
143 |
|
Aug 19, 2026 |
| Novva Tahoe Reno Data Center |
Novva Data Centers |
Storey |
NV |
Operating |
60 |
|
Aug 19, 2026 |
| Riot Platforms Corsicana Facility |
Riot Platforms |
Navarro |
TX |
Operating |
1000 |
|
Aug 19, 2026 |
| Switch Citadel Campus |
Switch |
Storey |
NV |
Operating |
130 |
|
Aug 19, 2026 |
| Vantage Data Centers New Albany Campus |
Vantage Data Centers |
Licking |
OH |
Operating |
|
|
Aug 19, 2026 |
| WhiteFiber NC-1 |
WhiteFiber |
Rockingham |
NC |
Operating |
|
|
Aug 19, 2026 |
| Meta Gallatin Data Center |
Meta |
Sumner |
TN |
Operating |
|
|
Jul 15, 2026 |
| AWS Clinton Data Center |
Amazon Web Services |
Hinds |
MS |
Operating |
|
|
Jun 9, 2026 |
| Google Widows Creek Data Center |
Google |
Jackson |
AL |
Operating |
|
|
Jun 1, 2026 |
| xAI Colossus |
xAI |
Shelby |
TN |
Operating |
|
|
Jun 1, 2026 |
| Globalinx Data Center Expansion |
Globalinx |
Virginia Beach |
VA |
Operating |
|
|
May 22, 2026 |
| Core Scientific Dalton 3 |
Core Scientific |
Whitfield |
GA |
Operating |
142 |
|
Mar 2, 2026 |