Is a Data Center Coming

All tracked data centers

966 of 966 tracked sites

Everything on our list, operating and planned, with the status we can document. Click a name for the sources, the map and the nearest neighbors. Or check a specific address.

ProjectOperatorCountyStateStatusMWNext dateUpdated
Advanced Energy and Intelligence Campus Fermi America Potter TX Under construction 11000 Aug 19, 2026
Aligned Energy Data Center PHX04 Aligned Data Centers Maricopa AZ Under construction Aug 19, 2026
Aligned PHX-13 (Glendale campus) Aligned Data Centers Maricopa AZ Under construction 72 Aug 19, 2026
AWS New Carlisle Data Center Campus Amazon Web Services St. Joseph IN Under construction Aug 19, 2026
Blueprint Georgetown Data Center Blueprint Data Centers Williamson TX Under construction 25 Aug 19, 2026
Centra Reno Data Center (RNO2 / Keystone) Centra Washoe NV Under construction 12 Aug 19, 2026
CloudBurst San Marcos Data Center I CloudBurst Data Centers / Evolve Holdings Hays TX Under construction 1200 Aug 19, 2026
CyrusOne DFW10 Data Center CyrusOne Bosque TX Under construction 190 Aug 19, 2026
CyrusOne New Albany Campus CyrusOne Licking OH Under construction Aug 19, 2026
EdgeConneX Cedar Creek Data Center I EdgeConneX Bastrop TX Under construction Aug 19, 2026
Fleet Data Centers South Valley and Peru Ridge Campuses Fleet Data Centers Storey NV Under construction 230 Aug 19, 2026
Lincoln Property Chandler Data Center (2500 W Frye Rd) Lincoln Property Company Maricopa AZ Under construction 4 Aug 19, 2026
Meta Johnstown Data Center Meta Licking OH Under construction Aug 19, 2026
Meta LEAP District Data Center Campus Meta Boone IN Under construction Aug 19, 2026
Meta Wood County Data Center Meta Wood OH Under construction Aug 19, 2026
Meta-BlackRock El Paso Data Center Campus Meta Platforms El Paso TX Under construction 1000 Aug 19, 2026
Microsoft FM 471 North Data Center Microsoft Medina TX Under construction Aug 19, 2026
New Era Helium-Sharon AI Ector County Data Center New Era Helium / Sharon AI (joint venture) Ector TX Under construction 250 Aug 19, 2026
Prime Data Centers Caldwell County Campus (AUS01/AUS02) Prime Data Centers Caldwell TX Under construction Aug 19, 2026
Project Blue Beale Infrastructure Pima AZ Under construction 600 Aug 19, 2026
Project Caprock Data Center Campus Aligned Data Centers Hale TX Under construction 540 Aug 19, 2026
Prometheus Meta Licking OH Under construction Aug 19, 2026
Serverfarm CTX2 Data Center Serverfarm Harris TX Under construction Aug 19, 2026
Serverfarm HTX2 Data Center Serverfarm Waller TX Under construction Aug 19, 2026
Stargate Abilene Data Center Campus Crusoe Energy (site developer); OpenAI and Oracle (anchor tenants) Taylor TX Under construction 1200 Aug 19, 2026
Stargate Milam County Data Center (Freebird) SB Energy (SoftBank) Milam TX Under construction 1000 Aug 19, 2026
Tract Buckeye Technology Park (Project Range) Tract Maricopa AZ Under construction 1800 Aug 19, 2026
Vantage AZ1 Goodyear Campus Vantage Data Centers Maricopa AZ Under construction 160 Aug 19, 2026
Vantage Frontier Campus Vantage Data Centers Shackelford TX Under construction 1400 Aug 19, 2026
Vantage NV1 Campus (Storey County) Vantage Data Centers Storey NV Under construction 224 Aug 19, 2026
xAI Colossus 2 xAI Shelby TN Under construction Aug 19, 2026
xAI Southaven Power Plant (MZX Tech) xAI DeSoto MS Under construction Hearing Aug 24 Aug 19, 2026
AWS Bossier Parish Campus Amazon Web Services Bossier LA Under construction Aug 18, 2026
AWS Madison County Mega Site Amazon Web Services Madison MS Under construction Aug 18, 2026
AWS Ridgeland Campus (Costas Property) Amazon Web Services Madison MS Under construction Aug 18, 2026
NorthMark Cloud and Compute Spartanburg NorthMark Cloud and Compute Spartanburg SC Under construction 450 Aug 17, 2026
VoltCore Somerville Data Center VoltCore Morgan AL Under construction 50 Aug 15, 2026
Google Moncks Corner expansion Google Berkeley SC Under construction Aug 13, 2026
Compass Datacenters Statesville Campus Compass Datacenters Iredell NC Under construction Aug 11, 2026
Microsoft Douglasville Data Center (FTY101) Microsoft Douglas GA Under construction Aug 10, 2026
Microsoft Palmetto Data Center Microsoft Fulton GA Under construction Aug 10, 2026
Switch KEEP 2.0 Atlanta North Campus Switch Bartow GA Under construction Aug 1, 2026
AWS Richmond County Campus Amazon Web Services Richmond NC Under construction Jul 31, 2026
QTS Lake Wylie Campus QTS York SC Under construction Jul 21, 2026
Meta Richland Parish Data Center (Hyperion) Meta Richland LA Under construction 5000 Jul 13, 2026
Hut 8 River Bend Data Center Hut 8 Corp West Feliciana LA Under construction 300 Jul 1, 2026
Meta Aiken County Data Center Meta Aiken SC Under construction 200 Jul 1, 2026
Google Botetourt Campus (Greenfield) Google Botetourt VA Under construction Jun 24, 2026
Core Scientific Dalton 4 Core Scientific Whitfield GA Under construction 170 Jun 4, 2026
Project Eisenhower QTS Data Centers Richmond GA Under construction Jun 2, 2026
Google St. George Data Centers Google Dorchester SC Under construction May 29, 2026
DC BLOX Atlanta East Hyperscale Data Center Campus DC BLOX Rockdale GA Under construction 154 Apr 28, 2026
Compass Datacenters Meridian Campus Compass Datacenters Lauderdale MS Under construction 500 Apr 22, 2026
Core Scientific Dalton 2 Core Scientific Whitfield GA Under construction 145 Mar 2, 2026
QTS Fayetteville Data Center Campus (Project Excalibur) QTS Data Centers Fayette GA Under construction Mar 1, 2026
Aurora AI Factory Nvidia Manassas VA Under construction 96 Oct 29, 2025
Meta Stanton Springs Data Center (Walton County) Meta Walton GA Under construction Dec 1, 2021
Meta Stanton Springs Data Center (Newton County) Meta Newton GA Under construction Feb 26, 2021
CleanArc Caroline County Campus CleanArc Data Centers Caroline VA Under construction 900
CloudHQ Manassas MDC Campus CloudHQ Manassas VA Under construction 300
Google Bermuda Hundred Campus Google Chesterfield VA Under construction
PowerHouse 95 (PH 95 North) PowerHouse Data Centers Spotsylvania VA Under construction 800
Amazon Cosgray Road Data Center Fuel Cell Array Amazon Franklin OH Approved 73 Aug 19, 2026
Amazon Weaver Road Data Center Amazon Union OH Approved Aug 19, 2026
AWS Project Cosmo (Marysville Innovation Park) Amazon Web Services Union OH Approved Aug 19, 2026
AWS Project Rise (Wheatfield) Amazon Web Services Jasper IN Approved Aug 19, 2026
Black Mountain Fort Worth Data Center Black Mountain Power LLC Tarrant TX Approved Aug 19, 2026
CyrusOne Mesa Campus (Elliot and Ellsworth) CyrusOne Maricopa AZ Approved Aug 19, 2026
Edged Veale Ranch Data Center Edged Data Centers (Endeavour) Tarrant TX Approved Aug 19, 2026
Energy Generation and Technology Campus W Holdings Pinal AZ Approved Aug 19, 2026
Faircrest Street Data Center (Perry Township) Panattoni Development Co. Stark OH Approved 240 Aug 19, 2026
Microsoft Licking County Data Center Campus Microsoft Licking OH Approved Aug 19, 2026
Monarch Data Center Campus Copia Power Lyon NV Approved 1000 Aug 19, 2026
Project Baccara Operator not disclosed Maricopa AZ Approved 700 Aug 19, 2026
Project Marvel (QTS Bessemer) QTS Data Centers Jefferson AL Approved 1200 Aug 19, 2026
Project Midway LPI Group Pinal AZ Approved Aug 19, 2026
QumulusAI Denton Modular Data Center QumulusAI Denton TX Approved 20 Aug 19, 2026
Radius Data Centers AllPoints 18 and 19 Radius Data Centers Hendricks IN Approved Aug 19, 2026
Switch LAS19 (southwest Las Vegas expansion) Switch Clark NV Approved Aug 19, 2026
Tonopah Data Center Campus (491st Ave and Thomas Rd) Operator not disclosed Maricopa AZ Approved Aug 19, 2026
AWS Caddo Parish Campus (Resilient Technology Park) Amazon Web Services Caddo LA Approved Aug 18, 2026
Burkhalter Road Data Center 4AM Development LLC Bulloch GA Approved 99 Aug 18, 2026
Prime Storage Delk Road Data Center Prime Storage Cobb GA Approved 18 Aug 13, 2026
Dahlgren West Operator not disclosed King George VA Approved Aug 1, 2026
Coleman Road Data Center DC BLOX Lowndes GA Approved Jul 28, 2026
Project Camellia OpenAI Effingham GA Approved 3200 Jul 23, 2026
Red Ace Data Center Campus Red Ace Capital Management Culpeper VA Approved Jul 2, 2026
Applied Digital Boyce Campus Applied Digital Rapides LA Approved Jul 1, 2026
Cielo Digital Infrastructure Gaffney project Cielo Digital Infrastructure Cherokee SC Approved 300 Jul 1, 2026
Stack Infrastructure Berry Hill Megasite Stack Infrastructure Pittsylvania VA Approved Jun 30, 2026
Project Firecracker Microsoft Floyd GA Approved Jun 1, 2026
Project Sail Prologis Coweta GA Approved 900 May 11, 2026
Ashland Technology Park (Tract) Tract Hanover VA Approved Apr 1, 2026
Green Energy Ventures Data Center Campus Green Energy Ventures King George VA Approved Feb 19, 2026
Pumpkin Technology Campus Operator not disclosed Columbia GA Approved Feb 4, 2026
White Oak Technology Park Google Columbia GA Approved Feb 4, 2026
Forsyth Technology Campus Trammell Crow Company Monroe GA Approved Feb 3, 2026
Pine Ridge Technology Park Eagle Rock Partners LLC Twiggs GA Approved 900 Feb 1, 2026
Wallace Jackson Data Center Campus Wallace Jackson LLC Spalding GA Approved Jan 22, 2026
Northern Data Maysville Northern Data Group Jackson GA Approved 200 Jan 1, 2026
Rumble Technology Park Cloverleaf Infrastructure Monroe GA Approved 1120 Jan 1, 2026
Bells Ferry Road Data Center MMM Acquisitions LLC Cobb GA Approved 108 Jun 17, 2025
TA Realty Data Center (Tanners Church Road) TA Realty subsidiary Clayton GA Approved 180 Jun 12, 2025
Project Bunkhouse Digital Realty Bartow GA Approved 1830 Jun 4, 2025
Spring Place Data Center Operator not disclosed Bartow GA Approved Jun 4, 2025
Coosa Data Center Atlas Development Floyd GA Approved May 28, 2025
Project Peach North Coweta Investors Coweta GA Approved 700 Apr 16, 2025
Henderson Farms Data Center Southeast Property Holdings, LLC Henry GA Approved Mar 28, 2025
Dixon Data Center Atlas Development Floyd GA Approved Feb 5, 2025
TC Atlanta Development Data Center TC Atlanta Development Douglas GA Approved Feb 4, 2025
Sailfish Investors Data Center Campus Sailfish Investors Walton GA Approved Jan 15, 2025
Province Group Powhatan Campus Province Group Powhatan VA Approved 300 Oct 28, 2024
Microsoft Union City Data Center Campus (ATL11) Microsoft Fulton GA Approved Sep 26, 2024
Hourigan Rezoning Hourigan Henrico VA Approved May 1, 2024
Cielo Digital Infrastructure Campus Cielo Digital Infrastructure LLC (Arroyo Investors) Culpeper VA Approved 240 Dec 5, 2023
Anchorstone SOVA Route 58 East Campus Anchorstone Advisors LLC Pittsylvania VA Approved 200
Arcola Grove Rezoning Operator not disclosed Loudoun VA Approved
Cross Mill Center Operator not disclosed Loudoun VA Approved
Upper Magnolia Green (Google) Google Chesterfield VA Approved
Aligned Data Centers Pataskala Proposal Aligned Data Centers Licking OH Filed Aug 19, 2026
Aligned Energy Data Center PHX06 Aligned Data Centers Maricopa AZ Filed Aug 19, 2026
Bitdeer Shalersville Data Center Proposal Bitdeer Technologies Group Portage OH Filed 750 Aug 19, 2026
Cologix Johnstown Campus Cologix Licking OH Filed 800 Aug 19, 2026
Cologix Orange Township Campus Cologix Delaware OH Filed Aug 19, 2026
Compass PHX II Campus Compass Datacenters Maricopa AZ Filed 108 Aug 19, 2026
Crusoe-Microsoft Abilene AI Factory Expansion Crusoe Energy Taylor TX Filed Aug 19, 2026
EdgeConneX Ashville Data Center EdgeConneX Pickaway OH Filed 800 Aug 19, 2026
EdgeConneX Cedar Creek Data Center II EdgeConneX Bastrop TX Filed Aug 19, 2026
Google Armstrong County Data Center Google Armstrong TX Filed Aug 19, 2026
Google Haskell County Data Centers Google Haskell TX Filed Aug 19, 2026
Google Midlothian Data Center Campus (Fifth Building) Google Ellis TX Filed Aug 19, 2026
Hut 8 Beacon Point Data Center Hut 8 Nueces TX Filed Aug 19, 2026
La Osa Project (Vermaland) Vermaland LLC Pinal AZ Filed 1000 Hearing Aug 26 Aug 19, 2026
Microsoft Granger Data Center Microsoft St. Joseph IN Filed Aug 19, 2026
Microsoft Perry Township Data Center Microsoft Stark OH Filed Aug 19, 2026
Microsoft PHX-83 (El Mirage campus expansion) Microsoft Maricopa AZ Filed Aug 19, 2026
Microsoft San Antonio Data Center Microsoft Bexar TX Filed Aug 19, 2026
Microsoft SAT 82 Data Center Microsoft Medina TX Filed Aug 19, 2026
Midland County Gas-Powered Data Center Platform Operator not disclosed Midland TX Filed 150 Aug 19, 2026
Mt. Comfort Technology Park EQT Real Estate Hancock IN Filed Aug 19, 2026
NTT Global Data Center Mesa (Pecos and Crismon) NTT Global Data Centers Maricopa AZ Filed Aug 19, 2026
Project Hutto Data Center Zydeco Williamson TX Filed 70 Aug 19, 2026
Project Infrared (CORVA) Data Center CORVA Infrastructure Services Lubbock TX Filed 27 Aug 19, 2026
Sunbury Area Data Center Campus (Trenton Township) City of Sunbury Delaware OH Filed Aug 19, 2026
Tract Caldwell Valley Technology Park Tract Caldwell TX Filed 4000 Aug 19, 2026
WhiteFiber Yadkin County campuses (NC-2, NC-3) WhiteFiber Yadkin NC Filed 60 Aug 19, 2026
300 Jones Road data center Operator not disclosed Spartanburg SC Filed Hearing Sep 21 Aug 17, 2026
Gardner Property Data Centers JK Land Holdings (Chuck Kuhn) Prince William VA Filed Aug 17, 2026
Project Oak Operator not disclosed Coweta GA Filed Hearing Aug 25 Aug 13, 2026
AWS Warren County Data Center Amazon Web Services Warren MS Filed Aug 1, 2026
Crossroads Tech Campus Operator not disclosed Spotsylvania VA Filed Aug 1, 2026
Beacon Data Centers Mobile County Campus Beacon Data Centers Mobile AL Filed Jul 30, 2026
Haven Oak Tech Park Tract Dinwiddie VA Filed Jul 30, 2026
Tuckahoe Technology Park Tract Goochland VA Filed 900 Jul 27, 2026
Brown Farm Road Data Center Oakley Real Estate Partners Bartow GA Filed Hearing Aug 24 Jul 22, 2026
Dulles Technology Park Operator not disclosed Loudoun VA Filed Jul 1, 2026
Project Indo Operator not disclosed Bartow GA Filed 2000 Jul 1, 2026
Spring Valley Tech Park Operator not disclosed Loudoun VA Filed Jul 1, 2026
Forest Lane Data Center Operator not disclosed Stafford VA Filed Jun 15, 2026
Google LaGrange Data Center Google Troup GA Filed Apr 21, 2026
Virginia Technology Park Equus Capital Partners Ltd. Frederick VA Filed Apr 10, 2026
Bridgeport Data Centers Operator not disclosed Coweta GA Filed Apr 1, 2026
Hickman Property Data Center Campus East Village Dothan, LLC Carroll GA Filed Mar 1, 2026
PCC-DeKalb Data Center Campus PCC-DeKalb, LLC DeKalb GA Filed Jan 1, 2026
Project Avemore Atlas Development LLC Carroll GA Filed Jan 1, 2026
Rockdale Technology Part 1 SDP Acquisitions Rockdale GA Filed Jan 1, 2026
River Park (Highway 16) Operator not disclosed Butts GA Filed Dec 1, 2025
Project West WHP-GA LLC Troup GA Filed 600 Nov 26, 2025
Newton County Technology Park (Social Circle Technology Park) TPA Group / SC Infrastructure LLC Newton GA Filed May 26, 2025
Gregory Road Data Center Campus JBW Investments LLC / JF Land Investments LLC Newton GA Filed Mar 28, 2025
Rocky Creek Road Data Center 0 Rocky Creek Road, LLC Henry GA Filed Mar 28, 2025
Strickland Road Farm Data Center Strickland Road Farms, LLC Henry GA Filed Mar 28, 2025
Embry Development Villa Rica site Embry Development Company Carroll GA Filed Feb 13, 2025
AWS Butts County - Building 1 Amazon (AWS) Butts GA Filed 69 Jan 7, 2025
Stonewall Tell Data Center (RSC) RSC Investment Management LLC Fulton GA Filed Dec 10, 2024
Project Pegasus (Coweta County, T5) T5@Atlanta IV, LP Coweta GA Filed Feb 1, 2024
EdgeCore Culpeper Campus EdgeCore Digital Infrastructure Culpeper VA Filed 432
EdgeCore Louisa County Campus EdgeCore Digital Infrastructure Louisa VA Filed 1100
Mattameade Tech Campus (formerly Orrock Tech Campus) Amazon Web Services Caroline VA Filed
Microsoft Boydton Expansion Microsoft Mecklenburg VA Filed
Winchester Gateway Operator not disclosed Frederick VA Filed
Cisco Systems Data Center Cisco Systems Collin TX Operating Aug 19, 2026
Core Scientific Denton Data Center Core Scientific (hosting CoreWeave) Denton TX Operating Aug 19, 2026
Duos Edge AI Amarillo Edge Data Center II Duos Edge AI Potter TX Operating Aug 19, 2026
Edged New Albany Data Center Edged Licking OH Operating 24 Aug 19, 2026
Flexential Cincinnati (West Chester) Data Center Flexential Butler OH Operating 4 Aug 19, 2026
Google Fort Wayne Data Center Google Allen IN Operating Aug 19, 2026
Google Storey County Data Center Google Storey NV Operating Aug 19, 2026
Microsoft PHX-10 Goodyear Campus Microsoft Maricopa AZ Operating 143 Aug 19, 2026
Novva Tahoe Reno Data Center Novva Data Centers Storey NV Operating 60 Aug 19, 2026
Riot Platforms Corsicana Facility Riot Platforms Navarro TX Operating 1000 Aug 19, 2026
Switch Citadel Campus Switch Storey NV Operating 130 Aug 19, 2026
Vantage Data Centers New Albany Campus Vantage Data Centers Licking OH Operating Aug 19, 2026
WhiteFiber NC-1 WhiteFiber Rockingham NC Operating Aug 19, 2026
Meta Gallatin Data Center Meta Sumner TN Operating Jul 15, 2026
AWS Clinton Data Center Amazon Web Services Hinds MS Operating Jun 9, 2026
Google Widows Creek Data Center Google Jackson AL Operating Jun 1, 2026
xAI Colossus xAI Shelby TN Operating Jun 1, 2026
Globalinx Data Center Expansion Globalinx Virginia Beach VA Operating May 22, 2026
Core Scientific Dalton 3 Core Scientific Whitfield GA Operating 142 Mar 2, 2026

Page 1 of 5 Next