Potter County, TX

Advanced Energy and Intelligence Campus

Fermi America (filed as Fermi America / Texas University System). Under construction. 11000 MW.

Fermi America and the Texas University System are developing an 11 gigawatt, 5,800 acre campus near Amarillo with 18 million square feet of data center space, to be powered by a mix of natural gas, solar, wind and nuclear generation. Geotechnical work began in mid 2025 and the developer expects the first 1 gigawatt of power by the end of 2026; the plan has drawn public debate over water and environmental impact at Amarillo City Council.

Status
Under construction
Operator
Fermi America
Applicant on record
Fermi America / Texas University System
Location
Amarillo, Potter County, TX (approximate, city center)
Size
11000 MW, 5800 acres, 18,000,000 sq ft
Cooling
Not reported
Utility
Southwestern Public Service (Xcel Energy)
First reported
2025
Last updated
August 19, 2026

What happens next

The site is under construction. The next step is opening.

Sources

What it would mean nearby

The cooling design has not been reported. If it uses evaporative cooling, a 11000 MW facility would draw roughly 34.9 million to 125.5 million gallons of water a day, about what 401,000 households use.

For how far this is from your own address, check it here. For a noise, water, and power bill estimate for one address, see the address report.

Other tracked projects within 25 miles

Common questions

Where is the Advanced Energy and Intelligence Campus data center?

It is in Amarillo, Potter County, TX.

Has the Advanced Energy and Intelligence Campus data center been approved?

Yes, it was approved and is now under construction.

How big is the Advanced Energy and Intelligence Campus data center?

Reported size: 11000 MW, 5800 acres, 18,000,000 square feet.