Switch KEEP 2.0 Atlanta North Campus

Switch. Under construction.

Switch's second Georgia hyperscale campus, a $772 million, 126 acre development in Cartersville on the former Carter Grove site, which the city rezoned to a Technology District. The first data center building, about 1,620 feet long, came online in the second quarter of 2026, with two more buildings under construction as part of a master plan that could extend through 2046. It is projected to generate roughly 15 million dollars a year in local tax revenue once built out.

Status
Under construction
Operator
Switch
Applicant on record
Switch
Location
Former Carter Grove planned development, Cartersville, Bartow County, GA (approximate, city center)
Size
MW not reported, 126 acres
Cooling
Not reported
Utility
Georgia Power
Last updated
August 1, 2026

Sources

What it would mean nearby

Base rate freeze through 2028 (docket 44280) holds base rates flat from July 2025. Fuel and storm riders are separate and can still move. 2026 fuel and storm cost settlement (docket 44280, 56765) takes about $4.04 a month off a typical bill from June 2026. The December 2025 certification of about 9,885 MW of new generation for data center load came with a promise of at least $8.50 a month of downward pressure on a typical bill in 2029 through 2031, because large customers are meant to carry more of the cost. Consumer groups warned it could instead add around $20 a month if the projected data center demand does not show up.

For a noise estimate and the three distance rings, check your own address.

Other tracked projects within 25 miles

Project Indo Operator not disclosed
4.5 mi NFiled 2000 MW Bartow County, GA

Is it near you?

Corrections and tips: use the address in the footer. We link every claim to its source.