Is a Data Center Coming

Lowndes County, AL

Project Red Clay (Cloverleaf Infrastructure)

Cloverleaf Infrastructure. Approved, 1500 MW

Houston-based Cloverleaf Infrastructure is planning Project Red Clay, a roughly 1.5 gigawatt data center on about 800 acres of farmland at the junction of US Highway 80 and Alabama Highway 21 near Burkville in Lowndes County, which would be about four times the size of Meta's existing data center in nearby Montgomery County. On October 13, 2026 the Lowndes County Commission voted 3-2, without the advance public notice originally scheduled, to approve a development agreement and roughly 1.15 billion dollar, 20 year county and state tax abatement package for the project, over objections from residents, the NAACP, and environmental advocates about transparency and the undisclosed end user. The developer projects about 1,000 construction jobs, 225 permanent jobs, and construction as early as 2027, with water for the site drawn from the Pintlala Water System.

How far is it from you?

Free. Every site we track within 25 miles of your address, nearest first, with how far each one is.

Status
Approved
Operator
Not disclosed
Applicant on record
Cloverleaf Infrastructure
Location
Burkville, Lowndes County, AL
Size
1500 MW, 800 acres
Cooling
Not reported
Utility
Not reported
First reported
2026-09
Last updated
October 19, 2026

What happens next

Still to come: permits and construction. Builders do not always announce a construction start date in advance.

Sources

What it would mean nearby

The cooling design has not been reported. If it uses evaporative cooling, a 1500 MW facility would draw roughly 4.8 million to 17.1 million gallons of water a day, about what 54,700 households use.

For how far this is from your own address, check it here. For what this site could mean for one street address, see the address report, $19.

History

October 19, 2026

Added as approved

Common questions

Where is the Project Red Clay (Cloverleaf Infrastructure) data center?

It is in Burkville, Lowndes County, AL.

Has the Project Red Clay (Cloverleaf Infrastructure) data center been approved?

Yes, it has been approved.

How big is the Project Red Clay (Cloverleaf Infrastructure) data center?

Reported size: 1500 MW, 800 acres.

Corrections and tips: use the address in the footer. We link every claim to its source.