Project Red Clay (Cloverleaf Infrastructure)
Cloverleaf Infrastructure. Approved, 1500 MW
Houston-based Cloverleaf Infrastructure is planning Project Red Clay, a roughly 1.5 gigawatt data center on about 800 acres of farmland at the junction of US Highway 80 and Alabama Highway 21 near Burkville in Lowndes County, which would be about four times the size of Meta's existing data center in nearby Montgomery County. On October 13, 2026 the Lowndes County Commission voted 3-2, without the advance public notice originally scheduled, to approve a development agreement and roughly 1.15 billion dollar, 20 year county and state tax abatement package for the project, over objections from residents, the NAACP, and environmental advocates about transparency and the undisclosed end user. The developer projects about 1,000 construction jobs, 225 permanent jobs, and construction as early as 2027, with water for the site drawn from the Pintlala Water System.
How far is it from you?
Free. Every site we track within 25 miles of your address, nearest first, with how far each one is.
Follow this project
One free email when Project Red Clay (Cloverleaf Infrastructure) changes status, a hearing is scheduled, or a comment deadline opens.
Unsubscribe with one click. We do not sell the list.
Buying or living near this site? Get the address report for $19.
- Status
- Approved
- Operator
- Not disclosed
- Applicant on record
- Cloverleaf Infrastructure
- Location
- Burkville, Lowndes County, AL
- Size
- 1500 MW, 800 acres
- Cooling
- Not reported
- Utility
- Not reported
- First reported
- 2026-09
- Last updated
- October 19, 2026
What happens next
Still to come: permits and construction. Builders do not always announce a construction start date in advance.
Sources
- Lowndes commission approves $1.15 billion tax break for a data center despite pushback, Alabama Reflector / News From The States, 2026-10-15
- Lowndes County Commission approves data center deal, WSFA 12, 2026-10-13
- Tax break for Lowndes County data center developer draws NAACP backlash, Alabama Political Reporter, 2026-10-16
- Data Center Gets Massive Tax Break in Surprise Vote by Lowndes Commission, Southern Environmental Law Center
What it would mean nearby
The cooling design has not been reported. If it uses evaporative cooling, a 1500 MW facility would draw roughly 4.8 million to 17.1 million gallons of water a day, about what 54,700 households use.
For how far this is from your own address, check it here. For what this site could mean for one street address, see the address report, $19.
History
Common questions
Where is the Project Red Clay (Cloverleaf Infrastructure) data center?
It is in Burkville, Lowndes County, AL.
Has the Project Red Clay (Cloverleaf Infrastructure) data center been approved?
Yes, it has been approved.
How big is the Project Red Clay (Cloverleaf Infrastructure) data center?
Reported size: 1500 MW, 800 acres.
Corrections and tips: use the address in the footer. We link every claim to its source.