Google (filed as Google LLC). Under construction.

Google is building a data center campus of three buildings, each about 300,000 square feet, plus three substations at the Greenfield Industrial Campus in Daleville. Grading permits were issued in February 2026 with the first building expected to be complete in 2028; Google says the first building will use air cooling.

Status
Under construction
Operator
Google
Applicant on record
Google LLC
Location
Botetourt Center at Greenfield Industrial Campus, Daleville, Botetourt County, VA (approximate, city center)
Size
MW not reported, 344 acres
Cooling
Air cooled
Utility
Appalachian Power
First reported
2026-03-26
Last updated
June 24, 2026

Sources

What it would mean nearby

2026 biennial base rate review (docket PUR-2026-00044) is pending; Appalachian Power says it would add about $8 to $10 to a typical monthly bill. 2024 biennial review (docket PUR-2024-00024) adds about $4.36 a month to a typical bill from March 2026.