EdgeConneX, working with San Antonio based Rackspace, is building a 440 million dollar, 578,000 square foot two story data center on a 140 acre complex near Wolf Lane and FM 535 in Cedar Creek, the first of four buildings planned as part of a 1.44 billion dollar campus.
Texas
Data centers in Bastrop County
We track 2 projects inside Bastrop County and 13 more within 25 miles of it. For a distance-specific answer, check your own address.
In Bastrop County
EdgeConneX Cedar Creek Data Center I EdgeConneX
EdgeConneX Cedar Creek Data Center II EdgeConneX
EdgeConneX filed plans for a second Bastrop County campus, two one story buildings totaling about 730,000 square feet on nearly 180 acres near Cedar Creek, costing roughly 700 million dollars, with construction expected to begin and run through the end of 2028.
Within 25 miles of Bastrop County
Cortex supercomputer Operator not disclosed
CyrusOne Austin Data Center II Operator not disclosed
Digital Realty Austin AUS11 Operator not disclosed
LightEdge Austin II Operator not disclosed
Data Foundry Austin 1 Data Center Operator not disclosed
Lumen Austin Operator not disclosed
Data Foundry - Texas Operator not disclosed
Alpheus DataCenter Alpheus
Lumen Austin Lumen Technologies
Element Critical Operator not disclosed
Prime Data Centers Caldwell County Campus (AUS01/AUS02) Prime Data Centers
Thin-nology Operator not disclosed
Power bills in Bastrop County
Most of the county is served by Bluebonnet Electric Cooperative.
Alerts for Bastrop County
One email when a filing, hearing or status changes within 25 miles of the county seat. For a tighter radius, check your own address and subscribe there.
Unsubscribe with one click. We do not sell the list.