Status: on hold to filed
Pacifico Data Center & Power Plant (Earl Callahan Road)
Pacifico Energy (filed as Pacifico CCK Energy 1 LLC). Filed, 490 MW
Pacifico Energy and BlackChamber filed a state building permit for the first building on the Earl Callahan Road campus in Cedar Creek, a 498,165 square foot structure known as Project Longhorn costing about 366 million dollars, with construction scheduled from late November 2026 to January 2028; multiple outlets report the project is in talks with AI company Anthropic. The same campus includes a proposed 1,300 megawatt, 48-turbine Pacifico gas-fired power plant filed as a standard (minor source) air permit that does not require public notice or comment, and on October 13, 2026 the Bastrop County Commissioners Court voted unanimously to ask TCEQ to hold a public meeting on its air emissions and cumulative pollution impacts, though that vote does not guarantee TCEQ will grant one. A resident group called Lost Pines Watch is organizing town halls and pressing for a clear way to submit comments to the official TCEQ record, noting that about 1,000 homes and 25 schools sit within four miles of the site.
How far is it from you?
Free. Every site we track within 25 miles of your address, nearest first, with how far each one is.
Follow this project
One free email when Pacifico Data Center & Power Plant (Earl Callahan Road) changes status, a hearing is scheduled, or a comment deadline opens.
Unsubscribe with one click. We do not sell the list.
Buying or living near this site? Get the address report for $19.
- Status
- Filed
- Operator
- Pacifico Energy
- Applicant on record
- Pacifico CCK Energy 1 LLC
- Location
- 382 Earl Callahan Road, Cedar Creek, TX, Bastrop County, TX (approximate, city center)
- Size
- 490 MW, 2842 acres, 498,165 sq ft
- Cooling
- Not reported
- Utility
- Bluebonnet Electric Cooperative
- First reported
- 2026
- Last updated
- November 2, 2026
What happens next
Still to come: public hearings, a rezoning or permit vote, and a utility interconnection agreement.
Sources
- Abbott orders pause of air permits for data centers. Experts question whether he has the authority., San Antonio Current, 2026-09-29
- Bastrop on the Record: The Governor Ordered a Data-Center Permit Pause. TCEQ's Pacifico File Is Still Pending., De Jure Media, 2026-09-23
- Gov. Abbott orders TCEQ to pause environmental permits for data centers until audit is complete, Houston Public Media, 2026-09-21
- $366M Cedar Creek Data Center Tied to Anthropic Clears State Roadblock, Hoodline, 2026-10-08
- Plans filed for $366M Pacifico-BlackChamber data center, Community Impact, 2026-10-09
- Bastrop County commissioners OK request for TCEQ meeting on gas plant concerns, CBS Austin, 2026-10-13
- Commissioners push TCEQ for public meeting on Cedar Creek power plant, Community Impact, 2026-10-14
- She was building her dream home. Then came a data center's 'minor' power plant on a shortcut permit, Straight Arrow News, 2026-10-18
- Bastrop Community Demands Transparency on $366M 'Project Longhorn' Data Center, Construction Review, 2026-10-21
What it would mean nearby
The cooling design has not been reported. If it uses evaporative cooling, a 490 MW facility would draw roughly 1.6 million to 5.6 million gallons of water a day, about what 17,900 households use.
For how far this is from your own address, check it here. For what this site could mean for one street address, see the address report, $19.
History
Added as on hold
Other tracked projects within 25 miles
Common questions
Where is the Pacifico Data Center & Power Plant (Earl Callahan Road)?
It is in Cedar Creek, Bastrop County, TX.
Has the Pacifico Data Center & Power Plant (Earl Callahan Road) been approved?
Not yet. An application has been filed and has not been decided.
How big is the Pacifico Data Center & Power Plant (Earl Callahan Road)?
Reported size: 490 MW, 2842 acres, 498,165 square feet.
Corrections and tips: use the address in the footer. We link every claim to its source.