Core Scientific Dalton 2
Core Scientific. Under construction. 145 MW.
Dalton 2, part of Core Scientific's existing high density campus at 2205 Industrial South Road, is a 145 megawatt, 250,000 square foot AI data center building with vertical construction underway as of early 2026 and full delivery targeted for early 2027. It sits alongside the company's older, already operating Dalton 1 building on the same campus, and both draw power from municipal utility Dalton Utilities, whose local peak load has roughly doubled since data centers arrived in the county.
Follow this project
One free email when Core Scientific Dalton 2 changes status, a hearing is scheduled, or a comment deadline opens.
Unsubscribe with one click. We do not sell the list.
Buying or living near this site? Get an address report.
- Status
- Under construction
- Operator
- Core Scientific
- Applicant on record
- Core Scientific
- Location
- 2205 Industrial South Road, Dalton, Whitfield County, GA
- Size
- 145 MW, 250,000 sq ft
- Cooling
- Not reported
- Utility
- Dalton Utilities
- Last updated
- March 2, 2026
What happens next
The site is under construction. The next step is opening.
Sources
- Core Scientific (CORZ) Q4 2025 Earnings Transcript, The Motley Fool, 2026-03-02
- High-Density Data Center in Dalton Georgia (Dalton 1 & 2), Core Scientific
What it would mean nearby
The cooling design has not been reported. If it uses evaporative cooling, a 145 MW facility would draw roughly 460,000 to 1.7 million gallons of water a day, about what 5,300 households use.
MEAG Power supplies the city owned utilities and expects data center load on its system to roughly double within about five years. City utility rates are set by each city, not the Public Service Commission.
For how far this is from your own address, check it here. For a noise, water, and power bill estimate for one address, see the address report.
Other tracked projects within 25 miles
Common questions
Where is the Core Scientific Dalton 2 data center?
It is in Dalton, Whitfield County, GA.
Has the Core Scientific Dalton 2 data center been approved?
Yes, it was approved and is now under construction.
How big is the Core Scientific Dalton 2 data center?
Reported size: 145 MW, 250,000 square feet.
Is it near you?
Corrections and tips: use the address in the footer. We link every claim to its source.