Bosque County, TX
CyrusOne DFW10 Data Center
CyrusOne (filed as CyrusOne / Calpine). Under construction. 190 MW.
CyrusOne and Calpine are building a 1.2 billion dollar, 190,000 square foot data center campus called DFW10 in Bosque County next to Calpine's Thad Hill Energy Center, under a new 190 megawatt power agreement, with operations expected to begin in late 2026.
- Status
- Under construction
- Operator
- CyrusOne
- Applicant on record
- CyrusOne / Calpine
- Location
- Whitney, Bosque County, TX (approximate, city center)
- Size
- 190 MW, 190,000 sq ft
- Cooling
- Not reported
- Utility
- Oncor
- First reported
- 2026
- Last updated
- August 19, 2026
Sources
- $1.2B data center campus underway in Bosque County, Texas Real Estate Research Center, 2026
- Texas Companies to Partner on Proposed $1.2B Data Center, Government Technology, 2026
What it would mean nearby
The cooling design has not been reported. If it uses evaporative cooling, a 190 MW facility would draw roughly 602,000 to 2.2 million gallons of water a day, about what 6,900 households use.
2025 base rate review (docket 58306) raised residential rates 3% from June 2026: about $4 to $6 a month on a $150 bill. This applies statewide in the ERCOT region, not just Oncor territory. It does not change a bill directly; it decides whether data center grid costs land on developers or on the delivery rates everyone pays.
For a noise estimate and the three distance rings, check your own address.