CyrusOne (filed as CyrusOne / Calpine). Under construction. 190 MW.

CyrusOne and Calpine are building a 1.2 billion dollar, 190,000 square foot data center campus called DFW10 in Bosque County next to Calpine's Thad Hill Energy Center, under a new 190 megawatt power agreement, with operations expected to begin in late 2026.

Status
Under construction
Operator
CyrusOne
Applicant on record
CyrusOne / Calpine
Location
Whitney, Bosque County, TX (approximate, city center)
Size
190 MW, 190,000 sq ft
Cooling
Not reported
Utility
Oncor
First reported
2026
Last updated
August 19, 2026

What happens next

The site is under construction. The next step is opening.

Sources

What it would mean nearby

The cooling design has not been reported. If it uses evaporative cooling, a 190 MW facility would draw roughly 602,000 to 2.2 million gallons of water a day, about what 6,900 households use.

2025 base rate review (docket 58306) raised residential rates 3% from June 2026: about $4 to $6 a month on a $150 bill. This applies statewide in the ERCOT region, not just Oncor territory. It does not change a bill directly; it decides whether data center grid costs land on developers or on the delivery rates everyone pays.

For how far this is from your own address, check it here. For a noise, water, and power bill estimate for one address, see the address report.

Common questions

Where is the CyrusOne DFW10 data center?

It is in Whitney, Bosque County, TX.

Has the CyrusOne DFW10 data center been approved?

Yes, it was approved and is now under construction.

How big is the CyrusOne DFW10 data center?

Reported size: 190 MW, 190,000 square feet.

Is it near you?

Corrections and tips: use the address in the footer. We link every claim to its source.