Taylor County, TX

Stargate Abilene Data Center Campus

Crusoe Energy (site developer); OpenAI and Oracle (anchor tenants) (filed as Crusoe Energy). Under construction. 1200 MW.

The flagship Stargate campus east of Abilene is being built by Crusoe Energy for OpenAI and Oracle. About four of eight planned buildings are already housing Nvidia chips and running, with the rest of the 1.2 GW target campus still under construction.

Status
Under construction
Operator
Crusoe Energy (site developer); OpenAI and Oracle (anchor tenants)
Applicant on record
Crusoe Energy
Location
Abilene, Taylor County, TX (approximate, city center)
Size
1200 MW
Cooling
Closed loop (low water)
Utility
AEP Texas
First reported
2025-01
Last updated
August 19, 2026