TECfusions. Under construction.

TECfusions is converting buildings at the former Alcoa research site in Upper Burrell Township into a data center, with the first of several old buildings already being converted as of mid 2026 reporting. Plans to convert the remaining buildings on the site have not been finalized publicly. Details on final size and power needs have not been released.

Status
Under construction
Operator
TECfusions
Location
Upper Burrell Township, Westmoreland County, PA (approximate, city center)
Size
MW not reported
Cooling
Not reported
Utility
Not reported
Last updated
August 29, 2026

Sources

What it would mean nearby

The order is meant to keep new data centers from pushing their power costs onto residential electric bills by requiring developers to pay for all of their own electricity. This does not change anyone's electric rate directly, but it is meant to stop the cost of new substations and power lines built for data centers from being added to everyone else's bill. This is the overall statewide trend behind the individual utility price to compare increases: the average Pennsylvania household's total electric bill grew by roughly a fifth between 2024 and 2026.

For a noise estimate and the three distance rings, check your own address.

Follow this project

One email when TECfusions Upper Burrell Data Center changes status or a new filing lands within 25 miles of it.

Unsubscribe with one click. We do not sell the list.

Other tracked projects within 25 miles

Is it near you?

Corrections and tips: use the address in the footer. We link every claim to its source.