Hale County, TX
Project Caprock Data Center Campus
Aligned Data Centers. Under construction. 540 MW.
Aligned Data Centers is developing Project Caprock, a 540 megawatt, 313 acre, six building campus totaling 1.65 million square feet just outside Abernathy in Hale County near Lubbock. The company expects the campus to add about 5 billion dollars to the regional economy, with the first building, LBB-01, targeted for service in the first quarter of 2027.
- Status
- Under construction
- Operator
- Aligned Data Centers
- Applicant on record
- Aligned Data Centers
- Location
- Abernathy, Hale County, TX (approximate, city center)
- Size
- 540 MW, 313 acres, 1,650,000 sq ft
- Cooling
- Not reported
- Utility
- South Plains Electric Cooperative
- First reported
- 2026
- Last updated
- August 19, 2026
Sources
- Aligned Breaks Ground on Project Caprock, Aligned Data Centers, 2026
What it would mean nearby
The cooling design has not been reported. If it uses evaporative cooling, a 540 MW facility would draw roughly 1.7 million to 6.2 million gallons of water a day, about what 19,700 households use.
For a noise estimate and the three distance rings, check your own address.
Other tracked projects within 25 miles
Is it near you?
Corrections and tips: use the address in the footer. We link every claim to its source.