Is a Data Center Coming

Morgan County, AL

VoltCore Somerville Data Center

VoltCore (filed as Sovereign Gazelle). Under construction. 50 MW.

A 50 megawatt Bitcoin mining data center is under construction on 15 acres near Somerville. Morgan County and the town both passed moratoriums, but officials say they are unenforceable because smaller Alabama counties have no zoning authority in unincorporated areas, so work is proceeding despite organized opposition.

Status
Under construction
Operator
VoltCore
Applicant on record
Sovereign Gazelle
Location
369 Union Road, Somerville, AL, Morgan County, AL
Size
50 MW, 15 acres
Cooling
Not reported
Utility
Joe Wheeler EMC
First reported
2026-04
Last updated
August 15, 2026

Sources

What it would mean nearby

The cooling design has not been reported. If it uses evaporative cooling, a 50 MW facility would draw roughly 159,000 to 571,000 gallons of water a day, about what 1,800 households use.

For a noise estimate and the three distance rings, check your own address.

Other tracked projects within 25 miles

SimpleHelix Operator not disclosed
20 mi NOperatingMadison County, AL

Is it near you?

Corrections and tips: use the address in the footer. We link every claim to its source.