SB Energy. Approved. 800 MW.

SB Energy, a SoftBank Group subsidiary, is building an AI data center campus of up to 10 gigawatts on and around the decommissioned Portsmouth Gaseous Diffusion Plant, a former uranium enrichment site near Piketon in Pike County, on federal land involving the US Department of Energy and Department of Commerce. OpenAI announced on August 17-18, 2026 that it will lease most of the campus as a 20 year anchor tenant, with roughly 8 gigawatts allocated to OpenAI, while NVIDIA is the exclusive AI compute infrastructure partner. A groundbreaking for an associated 9.2 gigawatt natural gas power facility was held March 20, 2026, and construction of the first 800 megawatt data center phase is set to begin in 2026 with capacity coming online starting 2028.

Status
Approved
Operator
SB Energy
Applicant on record
SB Energy
Location
Former Portsmouth Gaseous Diffusion Plant site, Piketon, Pike County, OH (approximate, city center)
Size
800 MW
Cooling
Not reported
Utility
Not reported
First reported
2026-08
Last updated
September 2, 2026

Sources

What it would mean nearby

The cooling design has not been reported. If it uses evaporative cooling, a 800 MW facility would draw roughly 2.5 million to 9.1 million gallons of water a day, about what 29,200 households use.

For a noise estimate and the three distance rings, check your own address.

Follow this project

One email when PORTS-Pike Technology Campus changes status or a new filing lands within 25 miles of it.

Unsubscribe with one click. We do not sell the list.

Other tracked projects within 25 miles

Is it near you?

Corrections and tips: use the address in the footer. We link every claim to its source.