Centra's data center at 265 Keystone Avenue in Reno, known during permitting as the Keystone Data Center, is a 3.26-acre, two-story, roughly 91,200 square foot building that won a conditional use permit on January 15, 2025 over objections from more than 20 nearby residents about noise, power and water strain. Centra has since broken ground on the project as its second Reno-area facility, next to an existing data center built in 1999.
Data centers in Washoe County
We track 1 project inside Washoe County and 7 more within 25 miles of it. For a distance-specific answer, check your own address.
In Washoe County
Within 25 miles of Washoe County
Power bills in Washoe County
Most of the county is served by NV Energy.
2026 fuel cost filings is pending; NV Energy says it would take about $4 to $6 off a typical monthly bill. Nothing here changes a bill today. What matters is whether the large load contract survives intact; if it is weakened, the cost of plants built for data centers starts showing up in the next general rate cases around 2027 and 2028. Sierra Pacific 2024 general rate case (docket 24-02026) adds about $2.00 a month to a typical bill from October 2024.
NV Energy filed a Deferred Energy Accounting Adjustment covering 2025 fuel and purchased power costs, with a PUCN evidentiary hearing held August 24, 2026 in Las Vegas; no decision had been issued as of this report. Separately, NV Energy filed a new rate request around August 19, 2026 that would lower Southern Nevada electric rates and raise natural gas rates effective October 1, 2026 if approved, though reporting on the dollar impact is inconsistent and it is not confirmed whether this is the same proceeding tracked here.
Every Nevada rate case in dollars a month, with hearing dates: willmybillgoup.com, our rate case tracker.
Alerts for Washoe County
An email when a filing, hearing, or status changes within 25 miles of the county seat. For a tighter radius, check your own address and subscribe there.
Unsubscribe with one click. We do not sell the list.
Want this worked out for one address? The address report covers noise, water, your power bill, and what is being planned nearby. See the address report.