Storey County, NV
Vantage NV1 Campus (Storey County)
Vantage Data Centers. Under construction. 224 MW.
Vantage Data Centers is building a 224 megawatt, four-building campus (NV1) on nearly 137 acres at Electric Avenue and USA Parkway in the Tahoe Reno Industrial Center, part of a roughly 3 billion dollar investment. The first of four buildings, NV11, was on track to open in the second quarter of 2026, with more than one million square feet planned across the full campus.
- Status
- Under construction
- Operator
- Vantage Data Centers
- Applicant on record
- Vantage Data Centers
- Location
- Electric Avenue and USA Parkway, Storey County, NV, Sparks, Storey County, NV
- Size
- 224 MW, 137 acres, 1,000,000 sq ft
- Cooling
- Not reported
- Utility
- NV Energy
- Last updated
- August 19, 2026
Sources
- Vantage announces 224MW data center campus in Reno, Nevada, Data Center Dynamics, 2026
- Vantage Data Centers Invests $3 Billion to Deliver AI Campus in Growing Nevada Market, Vantage Data Centers, 2026
What it would mean nearby
The cooling design has not been reported. If it uses evaporative cooling, a 224 MW facility would draw roughly 710,000 to 2.6 million gallons of water a day, about what 8,200 households use.
2026 fuel cost filings is pending; NV Energy says it would take about $4 to $6 off a typical monthly bill. Nothing here changes a bill today. What matters is whether the large load contract survives intact; if it is weakened, the cost of plants built for data centers starts showing up in the next general rate cases around 2027 and 2028. Sierra Pacific 2024 general rate case (docket 24-02026) adds about $2.00 a month to a typical bill from October 2024.
For a noise estimate and the three distance rings, check your own address.