Is a Data Center Coming

Storey County, NV

Vantage NV1 Campus (Storey County)

Vantage Data Centers. Under construction. 224 MW.

Vantage Data Centers is building a 224 megawatt, four-building campus (NV1) on nearly 137 acres at Electric Avenue and USA Parkway in the Tahoe Reno Industrial Center, part of a roughly 3 billion dollar investment. The first of four buildings, NV11, was on track to open in the second quarter of 2026, with more than one million square feet planned across the full campus.

Status
Under construction
Operator
Vantage Data Centers
Applicant on record
Vantage Data Centers
Location
Electric Avenue and USA Parkway, Storey County, NV, Sparks, Storey County, NV
Size
224 MW, 137 acres, 1,000,000 sq ft
Cooling
Not reported
Utility
NV Energy
Last updated
August 19, 2026

Sources

What it would mean nearby

The cooling design has not been reported. If it uses evaporative cooling, a 224 MW facility would draw roughly 710,000 to 2.6 million gallons of water a day, about what 8,200 households use.

2026 fuel cost filings is pending; NV Energy says it would take about $4 to $6 off a typical monthly bill. Nothing here changes a bill today. What matters is whether the large load contract survives intact; if it is weakened, the cost of plants built for data centers starts showing up in the next general rate cases around 2027 and 2028. Sierra Pacific 2024 general rate case (docket 24-02026) adds about $2.00 a month to a typical bill from October 2024.

For a noise estimate and the three distance rings, check your own address.

Other tracked projects within 25 miles

Is it near you?

Corrections and tips: use the address in the footer. We link every claim to its source.