Edged DeKalb Campus (Project Vector)

Edged (filed as Endeavour Energy). Approved.

Edged, a subsidiary of Endeavour Energy, proposed a four building, two substation data center campus on 560 acres on both sides of Illinois Route 23, north of Keslinger Road and just south of Meta's existing DeKalb data center. The DeKalb City Council approved the project unanimously on December 8, 2025, less than a month after it became public, with buildings phased in from 2027 through 2032.

Status
Approved
Operator
Edged
Applicant on record
Endeavour Energy
Location
DeKalb, DeKalb County, IL
Size
MW not reported, 560 acres, 2,965,000 sq ft
Cooling
Not reported
Utility
ComEd
First reported
2025-11
Last updated
August 29, 2026

Sources

What it would mean nearby

This case does not change what a household pays today, but it is the main tool Illinois regulators are using to try to stop the cost of new grid equipment for data centers from landing on residential bills. ComEd annual reconciliation rate case (docket 25-0383) adds about $3.10 a month to a typical bill from January 2026. PJM capacity auction price spike hits ComEd supply charges adds about $10.50 a month to a typical bill from June 2025.

For a noise estimate and the three distance rings, check your own address.

Follow this project

One email when Edged DeKalb Campus (Project Vector) changes status or a new filing lands within 25 miles of it.

Unsubscribe with one click. We do not sell the list.

Other tracked projects within 25 miles

Is it near you?

Corrections and tips: use the address in the footer. We link every claim to its source.