Is a Data Center Coming

Ector County, TX

New Era Helium-Sharon AI Ector County Data Center

New Era Helium / Sharon AI (joint venture) (filed as New Era Helium). Under construction. 250 MW.

New Era Helium and Sharon AI formed a 50-50 joint venture to build a 250 megawatt net zero energy data center in Ector County, drawing on Permian Basin natural gas and helium resources. Phase one, targeting 100 megawatts, is expected online by December 2026, with the rest by mid 2027.

Status
Under construction
Operator
New Era Helium / Sharon AI (joint venture)
Applicant on record
New Era Helium
Location
Odessa, Ector County, TX (approximate, county seat)
Size
250 MW
Cooling
Not reported
Utility
AEP Texas
First reported
2026
Last updated
August 19, 2026

What happens next

The site is under construction. The next step is opening.

Sources

What it would mean nearby

The cooling design has not been reported. If it uses evaporative cooling, a 250 MW facility would draw roughly 793,000 to 2.9 million gallons of water a day, about what 9,100 households use.

For how far this is from your own address, check it here. For a noise, water, and power bill estimate for one address, see the address report.

Other tracked projects within 25 miles

Common questions

Where is the New Era Helium-Sharon AI Ector County data center?

It is in Odessa, Ector County, TX.

Has the New Era Helium-Sharon AI Ector County data center been approved?

Yes, it was approved and is now under construction.

How big is the New Era Helium-Sharon AI Ector County data center?

Reported size: 250 MW.

Is it near you?

Corrections and tips: use the address in the footer. We link every claim to its source.