TeraWulf. Under construction. 360 MW.

TeraWulf's Lake Mariner campus, built on the site of the former Somerset coal fired power plant on Lake Ontario, is adding two new AI data center buildings on 61 acres in the parcel's northeastern corner, part of a 3.2 billion dollar expansion that would raise the 410 acre campus to 360 megawatts of capacity. The Niagara County Planning Board and the Somerset Town Board both gave unanimous approval to the required Planned Unit Development amendment, site plan, state environmental review, and special use permit in late 2025, and construction is underway with new operations expected in the second half of 2026, creating about 200 new jobs.

Status
Under construction
Operator
TeraWulf
Applicant on record
TeraWulf
Location
Somerset, Niagara County, NY (approximate, city center)
Size
360 MW, 61 acres
Cooling
Not reported
Utility
National Grid
Last updated
September 24, 2026

What happens next

The site is under construction. The next step is opening.

Sources

What it would mean nearby

The cooling design has not been reported. If it uses evaporative cooling, a 360 MW facility would draw roughly 1.1 million to 4.1 million gallons of water a day, about what 13,100 households use.

For how far this is from your own address, check it here. For a noise, water, and power bill estimate for one address, see the address report.

History

September 25, 2026

Added as under construction

Other tracked projects within 25 miles

Common questions

Where is the TeraWulf Lake Mariner Data Center Expansion?

It is in Somerset, Niagara County, NY.

Has the TeraWulf Lake Mariner Data Center Expansion been approved?

Yes, it was approved and is now under construction.

How big is the TeraWulf Lake Mariner Data Center Expansion?

Reported size: 360 MW, 61 acres.

Is it near you?