Google Cedar Rapids Data Center (Big Cedar)

Google. Under construction.

Google is building a data center campus on 414 acres at the Big Cedar Industrial Center in Cedar Rapids, part of a 576 million dollar initial project inside the company's broader 7 billion dollar Iowa investment. Construction was underway by mid 2025, with the first building targeted to open in 2026. This is one of three data center projects now moving forward in the same industrial park, alongside QTS and a smaller Oppidan facility.

Status
Under construction
Operator
Google
Applicant on record
Google
Location
Cedar Rapids, Linn County, IA (approximate, city center)
Size
MW not reported, 414 acres
Cooling
Not reported
Utility
Alliant Energy
First reported
2024-03
Last updated
August 29, 2026

Sources

What it would mean nearby

This raised the fixed monthly customer charge on a typical Alliant residential electric bill from $13 to $15.50, on top of any usage based charges. This is a private contract rate for a data center developer, not a residential rate, built to keep large new loads from raising costs for everyone else. This is a private contract rate for a data center developer, not a residential rate, but its minimum payment terms are meant to stop those costs from being shifted onto household bills.

For a noise estimate and the three distance rings, check your own address.

Follow this project

One email when Google Cedar Rapids Data Center (Big Cedar) changes status or a new filing lands within 25 miles of it.

Unsubscribe with one click. We do not sell the list.

Other tracked projects within 25 miles

ForceAmp.com Operator not disclosed
16 mi SEOperatingJohnson County, IA

Is it near you?

Corrections and tips: use the address in the footer. We link every claim to its source.