Is a Data Center Coming

Washtenaw County, MI

Stargate "The Barn" (OpenAI / Oracle / Related Digital)

Related Digital. Under construction, 1400 MW

OpenAI, Oracle and their developer Related Digital are building a large data center campus called Stargate on 250 acres in Saline Township, southwest of Ann Arbor, with construction underway since June 2026. The campus is expected to draw about 1.4 gigawatts of electricity from DTE Energy and uses closed loop cooling meant to limit daily water use to roughly what an office building uses. Neighbors have raised concerns about construction traffic, wetlands, and air permits, and the Michigan Attorney General is appealing the state's approval of DTE's power contract for the site.

How far is it from you?

Free. Every site we track within 25 miles of your address, nearest first, with how far each one is.

Status
Under construction
Operator
Related Digital
Applicant on record
Related Digital
Location
Saline Township, Washtenaw County, MI (approximate, city center)
Size
1400 MW, 250 acres, 1,650,000 sq ft
Cooling
Closed loop (low water)
Utility
DTE Electric
First reported
2025-10
Last updated
August 29, 2026

What happens next

The site is under construction. The next step is opening.

Sources

What it would mean nearby

DTE Electric is asking the commission for a 9.7% residential increase (2027 electric rate case (docket U-22046)). On a $160 monthly bill that is about $13 to $18 a month. 2026 electric distribution rate case (docket U-21860) raised residential rates 4.1% from March 2026: about $6 to $8 a month on a $160 bill. The order is meant to keep this one data center's power costs off the bills of regular DTE residential customers, but critics argue the fast, largely ex parte approval process did not fully test that promise.

For how far this is from your own address, check it here. For what this site could mean for one street address, see the address report, $19.

Other tracked projects within 25 miles

Common questions

Where is the Stargate "The Barn" (OpenAI / Oracle / Related Digital) data center?

It is in Saline Township, Washtenaw County, MI.

Has the Stargate "The Barn" (OpenAI / Oracle / Related Digital) data center been approved?

Yes, it was approved and is now under construction.

How big is the Stargate "The Barn" (OpenAI / Oracle / Related Digital) data center?

Reported size: 1400 MW, 250 acres, 1,650,000 square feet.