Is a Data Center Coming

Mason County, WV

Monarch Compute Campus (Nscale)

Nscale. Under construction. 1350 MW.

AI hyperscaler Nscale, which acquired the site through its March 2026 purchase of AIPCorp, is building the Monarch Compute Campus on about 2,250 acres near Point Pleasant in Mason County, on the Ohio River. The campus is West Virginia's first state certified, behind the meter microgrid, generating its own power on site from Marcellus Shale gas fed Caterpillar engines rather than drawing from the grid or local water supply, with a first 1.35 gigawatt phase built for Microsoft under a letter of intent and a longer term path to more than 8 gigawatts. Some Mason County residents near the site have been offered buyouts as construction proceeds, with the first phase targeted for operation in early 2027.

Status
Under construction
Operator
Nscale
Applicant on record
Nscale
Location
Point Pleasant, Mason County, WV (approximate, city center)
Size
1350 MW, 2250 acres
Cooling
Closed loop (low water)
Utility
Not reported
First reported
2026-03
Last updated
September 24, 2026

What happens next

The site is under construction. The next step is opening.

Sources

History

September 25, 2026

Added as under construction

Common questions

Where is the Monarch Compute Campus (Nscale) data center?

It is in Point Pleasant, Mason County, WV.

Has the Monarch Compute Campus (Nscale) data center been approved?

Yes, it was approved and is now under construction.

How big is the Monarch Compute Campus (Nscale) data center?

Reported size: 1350 MW, 2250 acres.

Is it near you?

Corrections and tips: use the address in the footer. We link every claim to its source.