Is a Data Center Coming

Effingham County, GA

Project Camellia (OpenAI Data Center)

OpenAI. Approved, 3200 MW

OpenAI's roughly 20 billion dollar, 3.2 gigawatt Project Camellia data center campus at the Savannah Gateway Industrial Hub near Rincon in Effingham County remains approved; Georgia PSC staff approved the underlying Georgia Power supply contract on August 27, 2026, and the site's existing industrial zoning already covers it. Two 2026 lawsuits, filed September 2 and September 21-22 in Effingham County Superior Court, challenge Ordinance 2026-352, the August 4, 2026 zoning amendment that allowed the project, with plaintiffs alleging the county skipped legally required public hearings before the planning board and county commission; neither suit has produced a stay or injunction. Effingham County is separately weighing stricter conditional use rules for future industrial and data center projects, including a proposed ban on on-site gas power generation, with commissioners scheduled to take up a possible moratorium at an October 6, 2026 meeting whose outcome could not be confirmed from available reporting.

How far is it from you?

Free. Every site we track within 25 miles of your address, nearest first, with how far each one is.

Status
Approved
Operator
OpenAI
Applicant on record
OpenAI
Location
Savannah Gateway Industrial Hub, Rincon, Effingham County, GA (approximate, city center)
Size
3200 MW, 1400 acres
Cooling
Not reported
Utility
Georgia Power
First reported
2026-07
Last updated
October 12, 2026

What happens next

Still to come: permits and construction. Builders do not always announce a construction start date in advance.

Sources

What it would mean nearby

The cooling design has not been reported. If it uses evaporative cooling, a 3200 MW facility would draw roughly 10.1 million to 36.5 million gallons of water a day, about what 116,700 households use.

Base rate freeze through 2028 (docket 44280) holds base rates flat from July 2025. Fuel and storm riders are separate and can still move. Real-time pricing revenue credit and cost allocation review (docket 57171) is pending before the commission without a published residential figure yet. 2026 fuel and storm cost settlement (docket 44280, 56765) takes about $4.04 a month off a typical bill from June 2026.

For how far this is from your own address, check it here. For what this site could mean for one street address, see the address report, $19.

Other tracked projects within 25 miles

Common questions

Where is the Project Camellia (OpenAI Data Center)?

It is in Rincon, Effingham County, GA.

Has the Project Camellia (OpenAI Data Center) been approved?

Yes, it has been approved.

How big is the Project Camellia (OpenAI Data Center)?

Reported size: 3200 MW, 1400 acres.