Microsoft. Under construction.

Microsoft is building a four building, roughly 980,000 square foot data center campus known as FTY101 on 160 acres at 1601 North River Road in Douglasville, part of its East US 3 Azure region that also includes sites in Fulton County. On August 10, 2026 Microsoft confirmed it is unwinding local property tax abatement deals here and at two Fulton County sites, East Point and Palmetto, saying the reputational cost of the tax breaks now outweighs the savings. Some third party trackers report a target capacity around 300 megawatts for this site, but that figure has not been independently confirmed by Microsoft or the county.

Status
Under construction
Operator
Microsoft
Applicant on record
Microsoft
Location
1601 North River Road, Douglasville, Douglas County, GA
Size
MW not reported, 160 acres, 980,000 sq ft
Cooling
Not reported
Utility
Not reported
Last updated
August 10, 2026

Sources

What it would mean nearby

Oglethorpe Power, which generates most of the electricity Georgia's EMCs sell, is adding natural gas plants it ties to data center and industrial load. EMC rates are set by each cooperative's board, not the Public Service Commission, so watch your EMC's rate notices.

For a noise estimate and the three distance rings, check your own address.

Other tracked projects within 25 miles

Is it near you?

Corrections and tips: use the address in the footer. We link every claim to its source.