CoreWeave Lancaster Data Center (Greenfield Road)

CoreWeave (filed as Chirisa Technology Parks). Filed. 100 MW.

CoreWeave, Chirisa Technology Parks and Machine Investment Group announced more than 6 billion dollars of investment to convert a former R.R. Donnelley printing plant in Lancaster city into an AI data center. The initial plan is for 100 megawatts of capacity with room to grow to 300 megawatts, and CoreWeave would be the sole tenant. A second former Donnelley property on Harrisburg Pike is part of the same overall investment.

Status
Filed
Operator
CoreWeave
Applicant on record
Chirisa Technology Parks
Location
216 Greenfield Rd, Lancaster, PA, Lancaster County, PA
Size
100 MW
Cooling
Not reported
Utility
PPL Electric
First reported
2025-07
Last updated
August 29, 2026

Sources

What it would mean nearby

The cooling design has not been reported. If it uses evaporative cooling, a 100 MW facility would draw roughly 317,000 to 1.1 million gallons of water a day, about what 3,600 households use.

PPL Electric distribution base rate case settlement raised residential rates 4.9% from July 2026: about $8 to $10 a month on a $184 bill. The order is meant to keep new data centers from pushing their power costs onto residential electric bills by requiring developers to pay for all of their own electricity. This does not change anyone's electric rate directly, but it is meant to stop the cost of new substations and power lines built for data centers from being added to everyone else's bill.

For a noise estimate and the three distance rings, check your own address.

Follow this project

One email when CoreWeave Lancaster Data Center (Greenfield Road) changes status or a new filing lands within 25 miles of it.

Unsubscribe with one click. We do not sell the list.

Other tracked projects within 25 miles

Is it near you?

Corrections and tips: use the address in the footer. We link every claim to its source.