Eagle Rock Partners. Withdrawn. 1000 MW.

A roughly 1,000 megawatt data center proposed on timberland near Smoaks in the ACE Basin watershed. After about 400 residents opposed it at a December 2025 hearing the developer did not reapply; the county passed a six month moratorium and is drafting an overlay district critics say may accommodate a future project on the same land.

Status
Withdrawn
Operator
Eagle Rock Partners
Applicant on record
Eagle Rock Partners
Location
Smoaks, Colleton County, SC (approximate, city center)
Size
1000 MW, 800 acres
Cooling
Not reported
Utility
Not reported
First reported
2025-11
Last updated
August 12, 2026

What happens next

This proposal will not move forward as filed, but the land it was proposed on can be proposed again under a new project. See other stopped projects.

Sources

What it would mean nearby

The cooling design has not been reported. If it uses evaporative cooling, a 1000 MW facility would draw roughly 3.2 million to 11.4 million gallons of water a day, about what 36,500 households use.

For how far this is from your own address, check it here. For a noise, water, and power bill estimate for one address, see the address report.

Other tracked projects within 25 miles

Common questions

Where is the Eagle Rock Partners Smoaks project data center?

It is in Smoaks, Colleton County, SC.

Has the Eagle Rock Partners Smoaks project data center been approved?

No. The developer withdrew the proposal.

How big is the Eagle Rock Partners Smoaks project data center?

Reported size: 1000 MW, 800 acres.

Is it near you?

Corrections and tips: use the address in the footer. We link every claim to its source.