Is a Data Center Coming

Louisa County, VA

EdgeCore Louisa County Campus

EdgeCore Digital Infrastructure. Filed, 1100 MW

EdgeCore is developing a high-density data center campus in Louisa County with a reported total capacity above 1.1 gigawatts and an investment described at roughly 17 billion dollars. Exact site address and permitting status have not been published.

How far is it from you?

Free. Every site we track within 25 miles of your address, nearest first, with how far each one is.

Status
Filed
Operator
Not disclosed
Applicant on record
EdgeCore Digital Infrastructure
Location
Louisa, Louisa County, VA (approximate, county seat)
Size
1100 MW
Cooling
Not reported
Utility
Not reported
Last updated
November 16, 2026

What happens next

Still to come: public hearings, a rezoning or permit vote, and a utility interconnection agreement.

Sources

What it would mean nearby

The cooling design has not been reported. If it uses evaporative cooling, a 1100 MW facility would draw roughly 3.5 million to 12.6 million gallons of water a day, about what 40,100 households use.

For how far this is from your own address, check it here. For what this site could mean for one street address, see the address report, $19.

Other tracked projects within 25 miles

Common questions

Where is the EdgeCore Louisa County Campus data center?

It is in Louisa, Louisa County, VA.

Has the EdgeCore Louisa County Campus data center been approved?

Not yet. An application has been filed and has not been decided.

How big is the EdgeCore Louisa County Campus data center?

Reported size: 1100 MW.

Corrections and tips: use the address in the footer. We link every claim to its source.