EdgeCore Digital Infrastructure. Filed. 1100 MW.

EdgeCore is developing a high-density data center campus in Louisa County with a reported total capacity above 1.1 gigawatts and an investment described at roughly 17 billion dollars. Exact site address and permitting status have not been published.

Status
Filed
Operator
Not disclosed
Applicant on record
EdgeCore Digital Infrastructure
Location
Louisa, Louisa County, VA (approximate, county seat)
Size
1100 MW
Cooling
Not reported
Utility
Not reported
Last updated
August 19, 2026

Sources

What it would mean nearby

The cooling design has not been reported. If it uses evaporative cooling, a 1100 MW facility would draw roughly 3.5 million to 12.6 million gallons of water a day, about what 40,100 households use.

For a noise estimate and the three distance rings, check your own address.

Other tracked projects within 25 miles

Is it near you?

Corrections and tips: use the address in the footer. We link every claim to its source.