Is a Data Center Coming

Fulton County, GA

Edged Atlanta (Tilford Yard)

Edged Energy. Operating. 168 MW.

Edged Energy opened the first building of a planned three building, 168 megawatt data center campus at the former Tilford Yard site at 1800 Thomas Street NW in Atlanta, with a grand opening on August 21, 2024. The facility uses waterless, air based cooling technology designed for AI and cloud computing workloads and was described as Edged's first ultra efficient North American data center.

Status
Operating
Operator
Edged Energy
Applicant on record
Edged Energy
Location
1800 Thomas Street NW (Tilford Yard), Atlanta, Fulton County, GA
Size
168 MW
Cooling
Air cooled
Utility
Not reported
Last updated
August 21, 2024

Sources

What it would mean nearby

Base rate freeze through 2028 (docket 44280) holds base rates flat from July 2025. Fuel and storm riders are separate and can still move. 2026 fuel and storm cost settlement (docket 44280, 56765) takes about $4.04 a month off a typical bill from June 2026. The December 2025 certification of about 9,885 MW of new generation for data center load came with a promise of at least $8.50 a month of downward pressure on a typical bill in 2029 through 2031, because large customers are meant to carry more of the cost. Consumer groups warned it could instead add around $20 a month if the projected data center demand does not show up.

For a noise estimate and the three distance rings, check your own address.

Other tracked projects within 25 miles

CenturyLink Operator not disclosed
3.8 mi SEOperatingFulton County, GA
Atlanta ATL13 Digital Realty
3.9 mi SEOperatingFulton County, GA

Is it near you?

Corrections and tips: use the address in the footer. We link every claim to its source.