Fulton County, GA
Edged Atlanta (Tilford Yard)
Edged Energy. . 168 MW.
Edged Energy opened the first building of a planned three building, 168 megawatt data center campus at the former Tilford Yard site at 1800 Thomas Street NW in Atlanta, with a grand opening on August 21, 2024. The facility uses waterless, air based cooling technology designed for AI and cloud computing workloads and was described as Edged's first ultra efficient North American data center.
- Status
- Operator
- Edged Energy
- Applicant on record
- Edged Energy
- Location
- 1800 Thomas Street NW (Tilford Yard), Atlanta, Fulton County, GA
- Size
- 168 MW
- Cooling
- Air cooled
- Utility
- Not reported
- Last updated
- August 21, 2024
Sources
- Edged Data Centers Celebrates Grand Opening of New Ultra-Efficient, Sustainable Data Center in Atlanta, PR Newswire, 2024-08-21
- Edged Data Centers Opens First Ultra-Efficient North American Data Center in Atlanta, Data Center Frontier, 2024-08-21
What it would mean nearby
Base rate freeze through 2028 (docket 44280) holds base rates flat from July 2025. Fuel and storm riders are separate and can still move. 2026 fuel and storm cost settlement (docket 44280, 56765) takes about $4.04 a month off a typical bill from June 2026. The December 2025 certification of about 9,885 MW of new generation for data center load came with a promise of at least $8.50 a month of downward pressure on a typical bill in 2029 through 2031, because large customers are meant to carry more of the cost. Consumer groups warned it could instead add around $20 a month if the projected data center demand does not show up.
For a noise estimate and the three distance rings, check your own address.
Other tracked projects within 25 miles
Is it near you?
Corrections and tips: use the address in the footer. We link every claim to its source.