Is a Data Center Coming

Fulton County, GA

Edged Atlanta (Tilford Yard)

Edged Energy. Operating. 168 MW.

Edged Energy opened the first building of a planned three building, 168 megawatt data center campus at the former Tilford Yard site at 1800 Thomas Street NW in Atlanta, with a grand opening on August 21, 2024. The facility uses waterless, air based cooling technology designed for AI and cloud computing workloads and was described as Edged's first ultra efficient North American data center.

Status
Operating
Operator
Edged Energy
Applicant on record
Edged Energy
Location
1800 Thomas Street NW (Tilford Yard), Atlanta, Fulton County, GA
Size
168 MW
Cooling
Air cooled
Utility
Not reported
Last updated
August 21, 2024

What happens next

The site is operating. A future expansion would show up here as a status change, or as a new project nearby.

Sources

What it would mean nearby

Base rate freeze through 2028 (docket 44280) holds base rates flat from July 2025. Fuel and storm riders are separate and can still move. Real-time pricing revenue credit and cost allocation review (docket 57171) is pending before the commission without a published residential figure yet. 2026 fuel and storm cost settlement (docket 44280, 56765) takes about $4.04 a month off a typical bill from June 2026.

For how far this is from your own address, check it here. For a noise, water, and power bill estimate for one address, see the address report.

Other tracked projects within 25 miles

CenturyLink Operator not disclosed
3.8 mi SEOperatingFulton County, GA
Atlanta ATL13 Digital Realty
3.9 mi SEOperatingFulton County, GA

Common questions

Where is the Edged Atlanta (Tilford Yard) data center?

It is in Atlanta, Fulton County, GA.

How big is the Edged Atlanta (Tilford Yard) data center?

Reported size: 168 MW.

Is it near you?

Corrections and tips: use the address in the footer. We link every claim to its source.