The Hive Data Center and Solar Plant (withdrawn)

Pegasus Group Holdings. Withdrawn. 340 MW.

Pegasus Group Holdings proposed a 3 billion dollar, 340 megawatt solar-powered data center called The Hive on 717 acres south of Kingman along Interstate 40, near the Griffith Energy Facility, in 2019, but withdrew the plans in 2021. Mohave County has since tightened its rules, now requiring any future data center proposal to supply its own power and water rather than drawing on county infrastructure, and there is currently no large-scale data center operating in the county.

Status
Withdrawn
Operator
Not disclosed
Applicant on record
Pegasus Group Holdings
Location
South of Kingman along Interstate 40, near the Griffith Energy Facility, AZ, Mohave County, AZ (approximate, city center)
Size
340 MW, 717 acres
Cooling
Not reported
Utility
Not reported
First reported
2019
Last updated
August 19, 2026

What happens next

This proposal will not move forward as filed, but the land it was proposed on can be proposed again under a new project. See other stopped projects.

Sources

What it would mean nearby

The cooling design has not been reported. If it uses evaporative cooling, a 340 MW facility would draw roughly 1.1 million to 3.9 million gallons of water a day, about what 12,400 households use.

For how far this is from your own address, check it here. For a noise, water, and power bill estimate for one address, see the address report.

Common questions

Where is the The Hive Data Center and Solar Plant (withdrawn)?

It is in Kingman, Mohave County, AZ.

Has the The Hive Data Center and Solar Plant (withdrawn) been approved?

No. The developer withdrew the proposal.

How big is the The Hive Data Center and Solar Plant (withdrawn)?

Reported size: 340 MW, 717 acres.