The Hive Data Center and Solar Plant (withdrawn)
Pegasus Group Holdings. Withdrawn. 340 MW.
Pegasus Group Holdings proposed a 3 billion dollar, 340 megawatt solar-powered data center called The Hive on 717 acres south of Kingman along Interstate 40, near the Griffith Energy Facility, in 2019, but withdrew the plans in 2021. Mohave County has since tightened its rules, now requiring any future data center proposal to supply its own power and water rather than drawing on county infrastructure, and there is currently no large-scale data center operating in the county.
Follow this project
One free email when The Hive Data Center and Solar Plant (withdrawn) changes status, a hearing is scheduled, or a comment deadline opens.
Unsubscribe with one click. We do not sell the list.
Buying or living near this site? Get an address report.
- Status
- Withdrawn
- Operator
- Not disclosed
- Applicant on record
- Pegasus Group Holdings
- Location
- South of Kingman along Interstate 40, near the Griffith Energy Facility, AZ, Mohave County, AZ (approximate, city center)
- Size
- 340 MW, 717 acres
- Cooling
- Not reported
- Utility
- Not reported
- First reported
- 2019
- Last updated
- August 19, 2026
What happens next
This proposal will not move forward as filed, but the land it was proposed on can be proposed again under a new project. See other stopped projects.
Sources
- $3bn "solar data center" proposed in Arizona, Data Center Dynamics, 2019
- Mohave County to Require Data Centers to Provide Power and Water, AZBEX, 2025
What it would mean nearby
The cooling design has not been reported. If it uses evaporative cooling, a 340 MW facility would draw roughly 1.1 million to 3.9 million gallons of water a day, about what 12,400 households use.
For how far this is from your own address, check it here. For a noise, water, and power bill estimate for one address, see the address report.
Common questions
Where is the The Hive Data Center and Solar Plant (withdrawn)?
It is in Kingman, Mohave County, AZ.
Has the The Hive Data Center and Solar Plant (withdrawn) been approved?
No. The developer withdrew the proposal.
How big is the The Hive Data Center and Solar Plant (withdrawn)?
Reported size: 340 MW, 717 acres.
Is it near you?
Corrections and tips: use the address in the footer. We link every claim to its source.