Is a Data Center Coming

Santa Clara County, CA

Prologis Silver Creek Valley Road Data Center

Prologis. Filed, 99 MW

Prologis filed plans in July 2026 for a three story, 516,000 square foot data center on a 15 acre vacant parcel at 5977 Silver Creek Valley Road in South San Jose, near Google and Apple facilities, capped at 99 megawatts to avoid triggering California Energy Commission licensing that applies at 100 megawatts and above. The plan includes an onsite substation, backup generation, and Prologis has committed to fund grid interconnection upgrades and a second, independently routed transmission line tied to a nearby PG&E substation on Santa Teresa Boulevard. This is a separate proposal from Prologis's larger STEM Park project on city owned land near Zanker Road, and as of mid 2026 the project still needed city approvals, with buildout targeted around 2028.

How far is it from you?

Free. Every site we track within 25 miles of your address, nearest first, with how far each one is.

Status
Filed
Operator
Prologis
Applicant on record
Prologis
Location
5977 Silver Creek Valley Road, San Jose, CA 95138, Santa Clara County, CA
Size
99 MW, 15 acres, 516,000 sq ft
Cooling
Not reported
Utility
Pacific Gas and Electric
First reported
2026-07
Last updated
October 19, 2026

What happens next

Still to come: public hearings, a rezoning or permit vote, and a utility interconnection agreement.

Sources

What it would mean nearby

The cooling design has not been reported. If it uses evaporative cooling, a 99 MW facility would draw roughly 314,000 to 1.1 million gallons of water a day, about what 3,600 households use.

For how far this is from your own address, check it here. For what this site could mean for one street address, see the address report, $19.

History

October 19, 2026

Added as filed

Other tracked projects within 25 miles

Equinix SV1 Equinix
1.1 mi SOperatingSanta Clara County, CA

Common questions

Where is the Prologis Silver Creek Valley Road data center?

It is in San Jose, Santa Clara County, CA.

Has the Prologis Silver Creek Valley Road data center been approved?

Not yet. An application has been filed and has not been decided.

How big is the Prologis Silver Creek Valley Road data center?

Reported size: 99 MW, 15 acres, 516,000 square feet.

Corrections and tips: use the address in the footer. We link every claim to its source.