Is a Data Center Coming

DeSoto County, FL

DCIP DeSoto County AI Data Center

DCIP Group. On hold, 4000 MW

Dallas based DCIP Group, led by CEO Jon Brown, kept trying to expand its DeSoto County data center complex beyond the 34 acre first phase the county approved in March 2026, but DeSoto County commissioners deadlocked 2 to 2 on two separate rezoning requests for the expansion, about 238 acres known as 3F Ranch on October 27, 2026 and about 554 acres on October 28, 2026, with Commissioner Steven Hickox recusing himself both times over a family ethics conflict. Both tie votes mean the rezoning requests failed for now, stalling the push toward the company's eventual goal of roughly 1,315 acres and 4,000 megawatts, though DCIP can revise and resubmit its applications. The already approved 34 acre first phase on Roan Street near Arcadia is unaffected, and the company's plan to avoid drawing from the local power grid is unchanged.

How far is it from you?

Free. Every site we track within 25 miles of your address, nearest first, with how far each one is.

Status
On hold
Operator
Not disclosed
Applicant on record
DCIP Group
Location
DeSoto County, FL (approximate, county seat)
Size
4000 MW, 1315 acres
Cooling
Closed loop (low water)
Utility
Not reported
First reported
2026-01
Last updated
November 2, 2026

What happens next

Paused by the developer, a regulator, or a court. It could resume, be withdrawn, or be replaced by a new filing on the same land.

Sources

History

November 3, 2026

Status: filed to on hold

September 25, 2026

Added as filed

Common questions

Where is the DCIP DeSoto County AI data center?

It is in DeSoto County, FL.

Has the DCIP DeSoto County AI data center been approved?

Not yet. It is on hold.

How big is the DCIP DeSoto County AI data center?

Reported size: 4000 MW, 1315 acres.

Corrections and tips: use the address in the footer. We link every claim to its source.