EdgeConneX. Filed. 800 MW.

EdgeConneX is considering an 800 megawatt data center complex on about 680 acres of farmland north of state Route 752 in Ashville, including a 1.8 gigawatt substation and a 200 megawatt gas turbine energy center. The proposal is facing local criticism and the company is seeking a 30 year full tax abatement; the village of Ashville has since passed a moratorium on new data center construction and South Bloomfield removed data centers as a permitted use.

Status
Filed
Operator
EdgeConneX
Applicant on record
EdgeConneX
Location
Ashville, Pickaway County, OH (approximate, city center)
Size
800 MW, 680 acres
Cooling
Not reported
Utility
Not reported
Last updated
August 19, 2026

Sources

What it would mean nearby

The cooling design has not been reported. If it uses evaporative cooling, a 800 MW facility would draw roughly 2.5 million to 9.1 million gallons of water a day, about what 29,200 households use.

For a noise estimate and the three distance rings, check your own address.

Other tracked projects within 25 miles

Google Google
14 mi EOperatingFairfield County, OH

Is it near you?