Is a Data Center Coming

Clayton County, GA

Lovejoy Data Center Campus

Operator not disclosed. Rumored.

A reported 400 acre data center campus proposal near Lovejoy in Clayton County, described by public radio station WABE as looming while county officials hold more talks with residents. No applicant, operator, megawatt figure, or formal rezoning filing has been publicly confirmed for this specific project, so key details remain unknown.

Status
Rumored
Operator
Not disclosed
Location
Lovejoy, Clayton County, GA (approximate, city center)
Size
MW not reported, 400 acres
Cooling
Not reported
Utility
Not reported
Last updated
August 1, 2026

Sources

What it would mean nearby

Base rate freeze through 2028 (docket 44280) holds base rates flat from July 2025. Fuel and storm riders are separate and can still move. 2026 fuel and storm cost settlement (docket 44280, 56765) takes about $4.04 a month off a typical bill from June 2026. The December 2025 certification of about 9,885 MW of new generation for data center load came with a promise of at least $8.50 a month of downward pressure on a typical bill in 2029 through 2031, because large customers are meant to carry more of the cost. Consumer groups warned it could instead add around $20 a month if the projected data center demand does not show up.

For a noise estimate and the three distance rings, check your own address.

Other tracked projects within 25 miles

Is it near you?

Corrections and tips: use the address in the footer. We link every claim to its source.