Added as rumored
STACK Infrastructure Goldendale Data Center
STACK Infrastructure. Rumored, 958 MW
Blue Owl Capital, which owns STACK Infrastructure, is developing a data center on the site of a former aluminum smelter next to the Columbia River and John Day Dam about 8 miles southeast of Goldendale, on land tied to owner Scott Tillman. The site has a 2022-era line load connection request for 958 megawatts of power with Klickitat Public Utility District, with reporting suggesting it could scale toward 1 gigawatt, and plans call for air cooled buildings rather than water intensive cooling. The project still needs a prospective purchaser consent decree from the Washington Department of Ecology before site remediation can begin, with cleanup not expected to start before mid-2027, and no formal county permit application has been filed yet.
How far is it from you?
Free. Every site we track within 25 miles of your address, nearest first, with how far each one is.
Follow this project
One free email when STACK Infrastructure Goldendale Data Center changes status, a hearing is scheduled, or a comment deadline opens.
Unsubscribe with one click. We do not sell the list.
Buying or living near this site? Get the address report for $19.
- Status
- Rumored
- Operator
- STACK Infrastructure
- Applicant on record
- STACK Infrastructure
- Location
- Goldendale, Klickitat County, WA
- Size
- 958 MW
- Cooling
- Air cooled
- Utility
- Klickitat Public Utility District
- First reported
- 2026-10
- Last updated
- October 12, 2026
What happens next
Nothing has been formally filed yet. If an application is submitted, the usual next steps are a rezoning or permit application, followed by public hearings.
Sources
- Rural Klickitat County faces surge in data center proposals, Washington State Standard, 2026-10-07
- Hyperscale data center developer confirmed, Columbia Gorge News
History
Other tracked projects within 25 miles
Common questions
Where is the STACK Infrastructure Goldendale data center?
It is in Goldendale, Klickitat County, WA.
Has the STACK Infrastructure Goldendale data center been approved?
Not yet. It has been reported, but nothing has been formally filed.
How big is the STACK Infrastructure Goldendale data center?
Reported size: 958 MW.