Is a Data Center Coming

Portage County, OH

Bitdeer Shalersville Data Center Proposal

Bitdeer Technologies Group. Filed. 750 MW.

Bitdeer Technologies Group, a Singapore based bitcoin mining and AI infrastructure firm, is proposing a data center in Shalersville Township targeting up to 750 megawatts of power capacity. A May 29 developer open house drew a standing room only crowd, and Shalersville Township trustees have since proposed a zoning code change that could effectively keep the project out of the township.

Status
Filed
Operator
Bitdeer Technologies Group
Applicant on record
Bitdeer Technologies Group
Location
Shalersville, Portage County, OH (approximate, city center)
Size
750 MW
Cooling
Not reported
Utility
Not reported
First reported
2026-06
Last updated
August 19, 2026

Sources

What it would mean nearby

The cooling design has not been reported. If it uses evaporative cooling, a 750 MW facility would draw roughly 2.4 million to 8.6 million gallons of water a day, about what 27,300 households use.

For a noise estimate and the three distance rings, check your own address.

Other tracked projects within 25 miles