Coweta County, GA
Bridgeport Data Centers
Operator not disclosed. Filed.
Developers are seeking to add data center buildings and substations to the existing Bridgeport Industrial Park, a large industrial site along U.S. Highway 27/29 near Interstate 85 in Coweta County that was originally approved in 2015 for manufacturing and warehouse use on a little over 1,000 acres. A Development of Regional Impact filing specific to the data center portion was submitted in April 2026, with about 360 acres proposed to remain as open space and an estimated property value of 3 to 5 billion dollars. The exact boundaries and address of the data center portion were not detailed in public reporting found for this entry, so the location shown is an approximate point along the industrial corridor rather than a confirmed site.
- Status
- Filed
- Operator
- Not disclosed
- Location
- Bridgeport Industrial Park, near U.S. Highway 27/29 and Interstate 85, Newnan, Coweta County, GA
- Size
- MW not reported
- Cooling
- Not reported
- Utility
- Not reported
- First reported
- 2026-04
- Last updated
- April 1, 2026
Sources
- Where Coweta's five proposed data centers stand, Newnan Times-Herald
- Bridgeport project revived with proposed data centers, Newnan Times-Herald
What it would mean nearby
Oglethorpe Power, which generates most of the electricity Georgia's EMCs sell, is adding natural gas plants it ties to data center and industrial load. EMC rates are set by each cooperative's board, not the Public Service Commission, so watch your EMC's rate notices.
For a noise estimate and the three distance rings, check your own address.