Red Ace Data Center Campus Red Ace Capital Management
Culpeper County, VA
Cielo Digital Infrastructure Campus
Cielo Digital Infrastructure LLC (Arroyo Investors). Approved. 240 MW.
Culpeper supervisors approved rezoning of four parcels totaling more than 120 acres along James Madison Highway for up to 2.4 million square feet of data centers with at least 240 megawatts of capacity, on a 7-2 vote in December 2023.
- Status
- Approved
- Operator
- Not disclosed
- Applicant on record
- Cielo Digital Infrastructure LLC (Arroyo Investors)
- Location
- Route 15/29 (James Madison Highway), Stevensburg, Culpeper County, VA (approximate, city center)
- Size
- 240 MW, 120 acres, 2,400,000 sq ft
- Cooling
- Not reported
- Utility
- Not reported
- Last updated
- December 5, 2023
Sources
- Culpeper County approves data center rezoning on James Madison Highway, InsideNoVa, 2023-12-05
What it would mean nearby
The cooling design has not been reported. If it uses evaporative cooling, a 240 MW facility would draw roughly 761,000 to 2.7 million gallons of water a day, about what 8,700 households use.
For a noise estimate and the three distance rings, check your own address.
Other tracked projects within 25 miles
EdgeCore Culpeper Campus EdgeCore Digital Infrastructure
Equinix CU2 Equinix
Remington Technology Park PointOne Holdings Inc.
Amazon Warrenton Data Center Amazon Data Services
Is it near you?
Corrections and tips: use the address in the footer. We link every claim to its source.