Cielo Digital Infrastructure Campus

Cielo Digital Infrastructure LLC (Arroyo Investors). Approved. 240 MW.

Culpeper supervisors approved rezoning of four parcels totaling more than 120 acres along James Madison Highway for up to 2.4 million square feet of data centers with at least 240 megawatts of capacity, on a 7-2 vote in December 2023.

Status
Approved
Operator
Not disclosed
Applicant on record
Cielo Digital Infrastructure LLC (Arroyo Investors)
Location
Route 15/29 (James Madison Highway), Stevensburg, Culpeper County, VA (approximate, city center)
Size
240 MW, 120 acres, 2,400,000 sq ft
Cooling
Not reported
Utility
Not reported
Last updated
December 5, 2023

Sources

What it would mean nearby

The cooling design has not been reported. If it uses evaporative cooling, a 240 MW facility would draw roughly 761,000 to 2.7 million gallons of water a day, about what 8,700 households use.

For a noise estimate and the three distance rings, check your own address.

Other tracked projects within 25 miles

Equinix CU2 Equinix
1.6 mi SEOperatingCulpeper County, VA