Is a Data Center Coming

Pinal County, AZ

La Osa Project (Vermaland)

Vermaland LLC. Filed. 1000 MW.

Vermaland's La Osa project would put a data center and power complex across 3,385 acres south of Eloy along the Greene Canal and Santa Cruz Wash, between Phoenix and Tucson. After sustained resident opposition, the developer cut the plan from 59 buildings and up to 3 gigawatts down to about 11 buildings capped at 1 gigawatt. The Pinal County Board of Supervisors is set to reconsider the rezoning and site plan on August 26, 2026.

Status
Filed
Operator
Not disclosed
Applicant on record
Vermaland LLC
Location
South of Eloy along the Greene Canal and Santa Cruz Wash, near Red Rock, AZ, Pinal County, AZ (approximate, city center)
Size
1000 MW, 3385 acres
Cooling
Not reported
Utility
Not reported
Next hearing
August 26, 2026, Pinal County Board of Supervisors
Last updated
August 19, 2026

Sources

What it would mean nearby

The cooling design has not been reported. If it uses evaporative cooling, a 1000 MW facility would draw roughly 3.2 million to 11.4 million gallons of water a day, about what 36,500 households use.

For a noise estimate and the three distance rings, check your own address.