Pinal County, AZ
La Osa Project (Vermaland)
Vermaland LLC. Filed. 1000 MW.
Vermaland's La Osa project would put a data center and power complex across 3,385 acres south of Eloy along the Greene Canal and Santa Cruz Wash, between Phoenix and Tucson. After sustained resident opposition, the developer cut the plan from 59 buildings and up to 3 gigawatts down to about 11 buildings capped at 1 gigawatt. The Pinal County Board of Supervisors is set to reconsider the rezoning and site plan on August 26, 2026.
- Status
- Filed
- Operator
- Not disclosed
- Applicant on record
- Vermaland LLC
- Location
- South of Eloy along the Greene Canal and Santa Cruz Wash, near Red Rock, AZ, Pinal County, AZ (approximate, city center)
- Size
- 1000 MW, 3385 acres
- Cooling
- Not reported
- Utility
- Not reported
- Next hearing
- August 26, 2026, Pinal County Board of Supervisors
- Last updated
- August 19, 2026
Sources
- 3,385-Acre La Osa Data Center and Power Complex Faces Rezoning Vote on April 16, Pinal Post, 2026-04-13
- Largest proposed data center in Arizona to be scaled back 80% after opposition, KJZZ Fronteras Desk, 2026-05-28
- Pinal County Advances Vermaland's La Osa Data Center Plan, Hoodline, 2026-04
What it would mean nearby
The cooling design has not been reported. If it uses evaporative cooling, a 1000 MW facility would draw roughly 3.2 million to 11.4 million gallons of water a day, about what 36,500 households use.
For a noise estimate and the three distance rings, check your own address.