Province Group. Approved. 300 MW.
Powhatan supervisors approved, 3-2, a rezoning and conditional use permit for a roughly 2.7 to 3 billion dollar Province Group campus at 1318 Page Road, three data center buildings totaling 1.525 million square feet at up to 300 megawatts. A later expansion added more acreage under a 2025 rezoning.
- Status
- Approved
- Operator
- Not disclosed
- Applicant on record
- Province Group
- Location
- 1318 Page Road, Powhatan, Powhatan County, VA
- Size
- 300 MW, 120 acres, 1,525,000 sq ft
- Cooling
- Not reported
- Utility
- Dominion Energy
- Last updated
- October 28, 2024
Sources
- Powhatan approves $2.7B data center campus, Virginia Business, 2024-10-28
What it would mean nearby
The cooling design has not been reported. If it uses evaporative cooling, a 300 MW facility would draw roughly 951,000 to 3.4 million gallons of water a day, about what 10,900 households use.
Deferred fuel cost recovery (docket PUR-2026-00078) is pending; Dominion Energy says it would add about $7 to $9 to a typical monthly bill. Data center cost allocation and transmission rider (docket PUR-2026-00056) adds about $0.94 a month to a typical bill, decided August 1, 2026. 2025 biennial review base rate increase (docket PUR-2025-00058) adds about $11.24 a month to a typical bill from January 2026.
For a noise estimate and the three distance rings, check your own address.
Other tracked projects within 25 miles