Is a Data Center Coming

Kent County, MI

Switch Grand Rapids (The Pyramid Campus)

Switch. Operating, 320 MW

Switch's Pyramid campus near Grand Rapids has been operating for years inside a converted Steelcase pyramid building and is one of the largest data center campuses in the eastern United States. The company is expanding the site toward a planned 1.8 million square feet and up to 320 megawatts of power, with a second building nearly complete and a third in planning. This is an established, already operating site rather than a new proposal.

How far is it from you?

Free. Every site we track within 25 miles of your address, nearest first, with how far each one is.

Status
Operating
Operator
Switch
Applicant on record
Switch
Location
6100 East Paris Avenue SE, Caledonia, MI, Gaines Charter Township, Kent County, MI
Size
320 MW, 1,800,000 sq ft
Cooling
Not reported
Utility
Consumers Energy
Last updated
August 29, 2026

What happens next

The site is operating. A future expansion would show up here as a status change, or as a new project nearby.

Sources

What it would mean nearby

The cooling design has not been reported. If it uses evaporative cooling, a 320 MW facility would draw roughly 1.0 million to 3.7 million gallons of water a day, about what 11,700 households use.

Consumers Energy is asking the commission for a 9.8% residential increase (2027-2028 electric rate case (docket U-22070)). On a $155 monthly bill that is about $13 to $17 a month. 2026 electric rate case (docket U-21870) raised residential rates 8.9% from May 2026: about $12 to $16 a month on a $155 bill. This does not change a typical home bill by itself, but it sets the rules meant to stop the cost of new data center power hookups from being spread across every Consumers Energy customer's rate.

For how far this is from your own address, check it here. For what this site could mean for one street address, see the address report, $19.

Other tracked projects within 25 miles

Common questions

Where is the Switch Grand Rapids (The Pyramid Campus) data center?

It is in Gaines Charter Township, Kent County, MI.

How big is the Switch Grand Rapids (The Pyramid Campus) data center?

Reported size: 320 MW, 1,800,000 square feet.

Corrections and tips: use the address in the footer. We link every claim to its source.