Is a Data Center Coming

Maricopa County, AZ

Microsoft PHX-10 Goodyear Campus

Microsoft. Operating. 143 MW.

Microsoft's PHX-10 campus anchors the Azure West US 3 region in Goodyear and is fully operational, with Phase I and II delivering a combined 143 megawatts of IT load as of 2026. Microsoft has committed 36 million dollars toward a 90 million dollar expansion of Goodyear's 157th Avenue wastewater treatment plant to support reclaimed water for cooling, and newer buildings in the region are shifting to air-cooled designs that Microsoft says avoid an estimated 42 million gallons of fresh water per building each year.

Status
Operating
Operator
Microsoft
Applicant on record
Microsoft
Location
Goodyear, Maricopa County, AZ (approximate, city center)
Size
143 MW
Cooling
Evaporative (water cooled)
Utility
Arizona Public Service
First reported
2021-06
Last updated
August 19, 2026

What happens next

The site is operating. A future expansion would show up here as a status change, or as a new project nearby.

Sources

What it would mean nearby

Reported as evaporative cooled. At 143 MW it would draw roughly 453,000 to 1.6 million gallons of water a day, about what 5,200 households use.

Arizona Public Service is asking the commission for a 16.4% residential increase (2025 general rate case (docket E-01345A-25-0105)). On a $160 monthly bill that is about $22 to $30 a month.

For how far this is from your own address, check it here. For a noise, water, and power bill estimate for one address, see the address report.

Other tracked projects within 25 miles

PHX-10 Microsoft
4.3 mi SOperatingMaricopa County, AZ

Common questions

Where is the Microsoft PHX-10 Goodyear Campus data center?

It is in Goodyear, Maricopa County, AZ.

How big is the Microsoft PHX-10 Goodyear Campus data center?

Reported size: 143 MW.

Is it near you?

Corrections and tips: use the address in the footer. We link every claim to its source.