Stalwart Development / Integrated Energy Concepts. Rumored, 200 MW

Marketing materials from Stalwart Development and engineer Integrated Energy Concepts describe Earth Station-76 as a 560,000 square foot, build to suit data center along the Route 130 corridor in Logan Township, scalable from 5 to more than 200 megawatts using onsite cogeneration with carbon capture. Rumors of the project prompted significant local concern, but Logan Township's mayor has said the facility was never formally proposed to the township, and Logan went on to ban data centers in 2026 regardless. No site plan or permit application appears to have been filed.

How far is it from you?

Free. Every site we track within 25 miles of your address, nearest first, with how far each one is.

Status
Rumored
Operator
Not disclosed
Applicant on record
Stalwart Development / Integrated Energy Concepts
Location
Logan Township, Gloucester County, NJ (approximate, city center)
Size
200 MW, 560,000 sq ft
Cooling
Not reported
Utility
Atlantic City Electric
Last updated
September 24, 2026

What happens next

Nothing has been formally filed yet. If an application is submitted, the usual next steps are a rezoning or permit application, followed by public hearings.

Sources

What it would mean nearby

The cooling design has not been reported. If it uses evaporative cooling, a 200 MW facility would draw roughly 634,000 to 2.3 million gallons of water a day, about what 7,300 households use.

For how far this is from your own address, check it here. For what this site could mean for one street address, see the address report, $19.

History

September 25, 2026

Added as rumored

Other tracked projects within 25 miles

Common questions

Where is the Earth Station-76 data center?

It is in Logan Township, Gloucester County, NJ.

Has the Earth Station-76 data center been approved?

Not yet. It has been reported, but nothing has been formally filed.

How big is the Earth Station-76 data center?

Reported size: 200 MW, 560,000 square feet.