Is a Data Center Coming

All tracked data centers

31 tracked data center sites in Michigan

10 match this filter.

How many of these are within 25 miles of you, and how far: free, no signup.

Everything on our list, operating and planned, with the status we can document. Click a name for the sources, the map, and the nearest neighbors.

Filter by state: MI
ProjectOperatorCountyStateStatusMWNext dateUpdated
Hyperscale Data / Alliance Cloud Services Dowagiac Campus Hyperscale Data (Alliance Cloud Services) Cass MI Operating 30 Aug 29, 2026
Switch Grand Rapids (The Pyramid Campus) Switch Kent MI Operating 320 Aug 29, 2026
Chick-fil-A Hiring Center Dennis Sampier Macomb MI Operating Feb 9, 2026
Comcast Comcast Wayne MI Operating Feb 9, 2026
EdgeConneX Detroit DET01 EdgeConneX Oakland MI Operating Feb 9, 2026
Liquid Web Operator not disclosed Eaton MI Operating Feb 9, 2026
Liquid Web, Inc Operator not disclosed Eaton MI Operating Feb 9, 2026
Quicken Loans data center Quicken Loans Wayne MI Operating Feb 9, 2026
US Signal data center US Signal Wayne MI Operating Feb 9, 2026
Verizon Wireless data center Verizon Wireless Wayne MI Operating Feb 9, 2026

Want this worked out for one street address? The address report, $19, covers what is being planned near it, your county's rules, and what each nearby site could mean for noise, water, and your bill. See the address report.